建造合同 篇1
本合同根据____法律组建并营业的,其总公司设在__________公司(下称建造方)为甲方和根据__________法律组建并营业的,其总公司设在____________公司(下称买方)为乙方于______年____月____日签订。
鉴于本合同中所含的相互约定,建造方同意按下面所订的条款在________________(下称船厂)建造、下水、装机、完工,并向买方出售和交付壹(1)艘________________船,详见本合同第一条(下称该船)买方同意按下述所订条款条件向建造方购买,从建造方接收该船并支付款项。
第一条 规格和船级
1.说明书:
该船应有建造方的船体编号第______号,并按本合同的条款,说明书和总布置图(统称说明书)建造、装机和完工,说明书经双方签字并附于本合同之后,为本合同不可分割的组成部分。
2.主要规格:
全长:______________________ 总吨位:____________________
两柱间长:______________________ 主机:____________________
型宽:______________________ 航速:____________________
型深:______________________ 续航力:____________________
设计吃水:______________________ 定员:____________________
上述主要规格的详细说明及定义、检验方法和计算均附列说明书中。
3.船级和规范:
该船包括其机器、设备、仪器应按__________规范建造,并由__________监造(下称船级社)应授予船级和______________标志。
该船应符合本合同签字生效后说明书中所指定船级社的规范并达到其标准要求。
为入级并符合上述规范和达到要求条件所需的全部费用均由建造方支付。
4.分包:
建造方可自行决定将该船建造工作中的任何一部分包出去,但责任由建造方承担。
5.登记:
根据__________法律在__________国的港口,按本合同规定的交船和验收时间,该船应由买方登记,其费用由买方自理。
第二条 合同价格和支付条件
1.合同价格:
该船的购买价为____________________日元(¥____________),这是建造方应收的净价(下称合同价),此价格不包括本合同第十七条规定的由买方提供的设备,并可按本合同项下的规定,予以上下调整。
2.货币:
本合同项下由买方向建造方支付的各期款项应为可自由兑换的日元。
3.付款条件:
由买方向建造方分期支付的合同价如下:
(1)第一期:
__________出具该船出口许可证后立即支付金额为__________日元(¥__________)。
(2)第二期:
该船铺龙骨后立即支付金额为__________________日元(¥__________)。
(3)第三期:
该船下水后立即支付金额为____________________日元(¥__________)。
(4)第四期:
交付该船后立即支付金额为____________日元(¥____________),再加上或减去由于合同价调整而增加或减少的所需的部门金额。
4.支付方式:
(1)第一期:
当收到建造方关于__________已出具该船出口许可证的电报通知后,买方应立即将本期金额电汇至______________银行(下称银行)建造方的帐户内。
(2)第二期:共11页,当前第1页
建造合同 篇2
甲方: (以下简称甲方)
乙方: (以下简称乙方)
根据《中华人民共和国劳动法》和公司相关规章制度的规定,经甲、乙双方友好协商,特签订本合同。
一、聘用条件
乙方通过国家建造师执业资格考试或考核,取得合格证书,并按相关规定能在省建设厅办理乙方在甲方执业的注册登记。
二、聘用期限 聘用期限为三年。即从建造师注册成功之日起(以建设部网上公告时间为准,下同)满三周年止。从注册成功起,每12个月为一个付费期,如需提前解聘,需在每个付费期结束前提前三个月告知对方知情。
三、聘用期间费用及付款方式
1.聘用期间甲方向乙方支付人民币(税后)1.8万/年作为基本服务费。
2.服务费支付方式,乙方交齐相关资料给甲方,甲方付给乙方5千元
定金(注册成功后该定金自动转为基本服务费的一部分),合同签订后,甲方应确保在本协议签订后三个月内将乙方建造师注册成功,如非乙方原因导致乙方建造师注册未成功,则聘用日期自本协议签订满三个月开始计算,甲方在聘用期开始计算7个工作日内将聘用工资余款一次性支付给乙方。将乙方建造师注册成功。自注册成功之日起的第一个星期内甲方付给乙方第一年的余款1.3万元整。第二、三年的聘用费用按合同规定,在签订合同日期的七个工作日内付清。
3.自合同签订之日起,乙方每年的建造师年检费及继续教育费用及地点由甲方负责。
四、聘用期间劳动关系和工伤处理方案(第四点去掉)
聘用期间,乙方不参与甲方经营,非甲方项目招投标或备案检查等甲方工作需要,不在甲方办公,涉及乙方在外的一切经营法律责任、债权债务关系和劳动关系均由乙方自行承担,与甲方无关。
五、聘用期间服务范围及相关费用
合同期间,甲方有权使用乙方的注册证书仅用于申报甲方公司的企业资质及年检,不用于承接工程项目。不得外借乙方证件及将乙方资格证书注册到其他企业。
六、聘用期间风险责任
如果由于甲方原因造成乙方的二级建造师资格证书、注册证书被吊销,甲方按注册人二级建造师当年基本服务费标准发放聘用工资,直至乙方重新注册成功为止,重新注册手续的办理及相关费用全部由甲方承担。
七、甲方的权利和义务
1、由甲方负责成功办理乙方初始注册(续期注册、变更注册、年检等)相关手续,相关费用由甲方承担。
2、甲方在聘用乙方期间,应及时传达建造师相关政策和法律规定的信息,积极支持和组织其业务和职业技能培训。
3、按时足额支付聘用费用;如甲方不按期支付聘用费用,由乙方提出解除聘用合同,甲方还应支付违约金2万元(改为1万元)整。
4、妥善保管乙方资料和证件,确保各类证书等完好无损,成功注册后
及时将毕业证交付乙方本人。毕业文凭(原件)因甲方过失而丢失损毁,甲方应赔付乙方伍万元(改为5000元),因甲方原因导致乙方的证件印章丢失的,甲方应负责全力为乙方挂失和补办,全部费用由甲方承担,乙方给予配合。补办期间,不耽误乙方正常注册,否则,甲方应按该协议标准人民币1.8万/年的协议费继续支付乙方聘用工资直到证书能正常使用为止。如因乙方原因导致上述情况,则甲方不承担任何责任。
6、甲方不得将乙方的建造师资格证书变更注册到其他单位,不得做出有损于乙方利益的其他行为。因甲方原因给乙方造成行政、法律后果和经济损失的,全部责任应由甲方承担。
7、甲方在注册(变更)成功公告后不按合同约定支付报酬及交付建造师注册印章(十个工作日内),视为违约。
八、乙方的权利和义务
1、乙方承诺向甲方提供真实合法资料,若乙方提供的资料是虚假伪造的,乙方自行承担一切责任,并负责赔偿甲方相应损失。乙方在聘用期间依法履行建造师职务时,有权要求得到甲方的支持和保护。
2、乙方应严格遵守甲方的相关规章制度,遵守职业道德和职业纪律。
3、乙方必须严格遵守本合同约定的聘用期限,保证合同顺利履行。
九、合同的解除
凡具备下列条件之一的,本合同解除:
1、在协议有效期内,甲乙双方不得擅自单方解除协议,如因此造成损失,由擅自解除协议一方负责。如果甲乙双方在协议期内需要变动协议,应本着相互支持与理解的原则,提前一个月通知对方,以便另一方做好
工作安排。
2、如果双方同意解除协议,甲方应提前出具解聘证明、职业道德证明等有关转注册证明给乙方,以便乙方办理转注手续,并返还乙方留存在甲方处的所有证明文件(资格证、注册证等),不得无故刁难。
3、在下列情况下,乙方有权提前解除协议:
(1)甲方被依法撤销的。(2)甲方违反合同第七条规定的。
(3)甲方不能按时支付乙方工资或有其他违约行为。
4、在下列情况下,甲方有权提前解除协议:
(1)乙方因乙方自身原因被依法取消建造师资格的。
(2)乙双方违反合同第八条规定的。
(3)乙方在除甲方以外的单位注册本职业资格,或通过任何途径伤害甲方名誉或泄漏甲方商业秘密。
十、违约责任
本合同一经双方签订,任何一方不得擅自违反,否则,由违约方承担相关责任,如因违约行为给对方造成损失的,还应承担赔偿责任。
十一、其他事项
1、达到本合同解除条件或聘用期正常期满前一个月,甲方必须积极配合乙方办理注册证书变更迁出手续,开具乙方解聘证明,不得无故刁难。
2、甲方不承担聘用期间内乙方任何伤、残、病、死亡等其他原因产生的费用。
3、聘用期内,若乙方自身工作或学习需要临时使用证件,可要求甲方及时配合借用,但使用时间应以不影响甲方工作为前提。特殊情况,由甲
乙双方协商处理。
4、乙方可将执业资格证书及执业印章自行保管,如因甲方工作需要必须经得乙方书面同意,方可使用。
十二、本合同自双方签字盖章之日起生效,如有未尽事宜,经双方协商作出补充规定,补充规定与本合同具有同等法律效力。本合同一式两份,甲、乙双方各执一份。
甲方:湖南 有限公司 乙方:
法人代表或委托代理人签字: 电话:
电话: 合同签订时间: 年 月 日
建造合同 篇3
甲方:
乙方: 身份证号码:
因发展需要,甲方需聘用国家注册二级建造师(房建专业),经过真诚协商,双方达成如下聘用条款:
一、注册聘用期:甲方聘用乙方的注册期限为 壹 年,每年薪金为: 元整,薪资支付方式为:壹年一付。
二、乙方应向甲方提供二级建造师执业资格合格证、毕业证书、身份证(原件)、乙方一寸二寸彩色相片各4张,以及其它甲方注册过程中需要的一些证明材料。
在当日验证完成双方签定本合同后,甲方即付给乙方 元整,并报销原返程车旅费。乙方的身份证和毕业证甲方在报送上级主管部门审核后归还(十五个工作日左右)。第二年若甲方继续聘用乙方,第二年薪金由甲方在合同到期前提前一个月一次性支付给乙方。
乙方姓名: 开户行: 银行帐号: 。
三、甲方办理注册期限为50个工作日,超过 50 个工作日视同注册成功,必须付给上述款项;若因乙方原因,导致不能完成注册时,乙方应将已收到的薪资全部退还给甲方,并收回全部证件(甲方均应出具有效书证予以证实)。若是甲方单位原因导致乙方不能完成注册的,则退还首付款的50%。
四、聘用期间,若国家开通对建造师继续教育,乙方在聘用期内的继续教育(含继续教育期间标准的差旅住宿费用)均由甲方负担,乙方凭相关票据向甲方报销。如因甲方需要乙方到公司配合的,甲方应提前与乙方协商,报销原返程车旅费、食宿费。
五、完成注册后,乙方只作为甲方资质升级和年检之用,乙方的“注册证书、执业资格证书”交由甲方妥善保管,其注册章及其他证书原件应交还给乙方。在甲方办理资质申报、年检或有关部门检查时,若需有关证书原件、印章等,乙方应及时配合提供,不得延误。
若超出以上范围,甲方要使用乙方证书或印章时,则应经双方协商,经乙方书面同意后,方可使用,并付给相应报酬或津贴。如甲方不经乙方同意私自使用所引起的一切后果由甲方承担。
六、在合同期内,甲方应为乙方在《执业手册》上登记聘用期间的执业情况,并为乙方办理该证的年检工作,年检费用由甲方支付,乙方若有其他需要注册的证件,甲方有义务协助乙方办理相关注册手续;甲方保证乙方资格证件的年检及时、有效,保证乙方继续教育等工作的及时进行。
七、解聘:乙方必须在聘用合同的壹年期满后,才可转注,在合同期满时,甲方应提前30天出具乙方的解聘证明、职业道德证明等有关转注册证明,方便乙方办理转注的手续。乙方要求提前解聘的,也应提前30天通知甲方说明具体情况,并应退还已收的辞聘后期间的薪资,且甲方不再负担其再教育学习费用。甲方要求提前解聘的,则应支付剩余期间的薪资。
八、续聘:聘用期满,双方有意签订续聘合同,具体事宜由双方另行协商。
九、违约责任:
甲方负责乙方在注册期内的再教育学习的一切费用及手续,如甲方没有在注册期满前完成乙方的再教育学习手续和转注册的证明材料,造成乙方无法转注的,甲方应向乙方赔偿因此延期的薪金,且由甲方办理转注手续,直至乙方能转注为止。
如果由于甲方原因发生乙方的证件丢失,甲方应赔偿乙方相关损失,金额如下:若资格证、注册证丢失,甲方负责补办,如造成经济损失由甲方进行赔偿;由于大学文凭(原件)无法补办,若丢失损毁,甲方应赔付乙方伍万元整;如因乙方自身原因造成不良后果,甲方概不负责。
建造合同 篇4
发包人(甲方):承包人(乙方):
根据《中华人民共和国合同法》、《建筑安装工程承包合同条例》,结合本工程具体特点,经甲、乙双方协商,达成以下协议条款,双方共同遵守。
一、工程概况:
1、工程名称:
2、建设地点:
3、工程内容:
4、工程数量:约立方米,以正式现场收方为准。
二、工程承包范围:
甲方将桩基工程、基础地梁、承台 以包工包料方式承包给乙方,不包含土方。以甲方提供的设计施工图纸、图纸会审纪要、变更通知等规定要求为依据。如甲方另有增加工程,甲乙双方另外协商。甲方提供乙方能顺利施工的条件。
三、工程承包形式:
甲方以包工包料形式,含所有检测费用承包给乙方施工。
四、工程工期:
乙方必须严格按照以下确定的'工期进行施工,否则将按第十二条第2款相 关规定予以处罚。(以下工期为有效工期)
(一)、工程施工阶段总工期为日历天,开工预计日期:年 月 日
(具体开工时间按甲方项目部书面通知为准)。
(二)工期顺延条件:遇到以下情况之一,经甲方现场代表签证并经甲方项目 部签章认可后,工期方可顺延。其余任何理由均不能作为工期顺延的条件。
1、按合同约定,不能提供施工场地、水、电源、道路未能畅通,障碍物未能清除,影响进场施工。
2、在施工中如因停电、停水8小时以上或连续停水停电3天以上(每次连续4小时以上),影响正常施工。
3、人力不可抗拒的因素而延长工期。
4、工程款未按合同支付。
(三)如甲方未在开工前提供施工场地,提供图纸及因甲方原因工程延期开工、停建、缓建、暂停施工(不含勒令停工),甲方承担包括乙方窝工、停工、机械进出场、台班费等在内的所有责任及因此产生的相关费用。
五、工程质量:
乙方必须严格按照设计施工图纸和现行国家及湖南省有关的施工验收规范、规程进行施工,乙方承包范围内的所有工程质量等级必须全部达到合格以上标准。
1、本工程质量必须通过相关部门检测合格。非甲方地质原因(软弱地层或破碎带)造成的质量不合格,乙方承担整改、加固等技术补救措施而发生的所有费用,包括职能部门协调及设计增加费用。
2、乙方必须严格按施工图纸、说明文件和国家颁发的建筑工程规范和质量标准施工,并接受甲方派驻代表的监督。
3、由乙方提供的主要材料、设备、构配件、半成品必须按有关规定提供质量合格证或进行检验合格后方可用于工程。对材料改变或代用必须经原设计单位同意和甲方代表、监理签字认可后,才准使用。
4、该工程的主要材料的品牌由甲方指定(合同已明确主材品牌)。
5、隐蔽工程必须经甲方派驻代表验收后方可进行下一道工序。
6、乙方应按质量验评标准对工程进行分项、分部和单位工程质量进行评定,并及时将单位工程质量、评定结果送监理公司及相关部门。在工程结算完成以前必须递交合格的相关技术资料供甲方备案。否则甲方有权拒付工程款。
7、乙方在施工中发生质量事故,应及时报告甲方派驻代表和监理公司,一般质量事故处理结果应送甲方、监理公司和相关部门备案,重大事故的处理方案应经设计单位、监理公司、相关部门、甲方等单位共同研究,并待处理方案确定后才准进入下一道工序施工。
8、本工程除按国家法律规定通过下相关部门监督外,采取施工单位、监理单位、建设单位三级质量管理体系,实行定期或不定期联合检查制度,施工单位自检、监理单位复检,建设单位审核,均应落实到具体负责人,杜绝工程质量隐患。工程量收方时,必须由建设方及监理方三人以上在场时方可进行,并做好施工现场记录。
9、开工前乙方应将《施工组织设计方案》送交甲方工程管理部门及监理公司(甲方聘任,下同),经甲方工程管理部门及监理公司审核同意,发出《开工通知书》后方可开工。
10、乙方应严格按照设计文件的要求及有关规范进行施工,桩头进入持力层,达到设计要求,必须经甲、乙双方及监理公司指定的现场监理工程师共同验收确认,每桩均应办理签证手续,并做完整的施工技术记录。
六、文明、安全施工:
1、乙方必须按照现行建筑安全操作规程和省市相关规定及甲方要求,做好现场文明安全施工工作。要有严格详细的安全保证措施,杜绝安全事故的发生,在施工期间必须有专职安全员值班,在施工期间发生人身、财产、工程安全事故必须在十二小时内书面报告给甲方,并积极主动做好事故的处理工作。对甲方和有关部门提出的安全、质量隐患必须及时整改,如因文明安全事故问题产生的责任及费用全部由乙方自行负责与承担。
2、桩基施工完成后,乙方必须在三天内移走所有设备及周转材料。
七、工程结算方式:
1、本工程桩基础按(r+a)×Π×L+扩底体积施工图桩径尺寸加护壁尺寸加扩底尺寸,乘以实际收方长度计算体积,实桩单价按950元/立方米,按实结算。空桩单价按280元/立方米,按实结算。
2、桩基承台、独立承台及地梁按实际地面面积 元/平方米,按实结算。
3、以上单价不含水电费,不含税金。劳保基金由甲方负责。
八、工程保证金
乙方在签订合同3日内向甲方交纳200万元(人民币)的工程保证金,乙方完成所承包合同范围内所有工程的50%工程量,甲方返还50%工程保证金给乙方,乙方所承包合同范围内工程完成验收合格后甲方返还全部工程保证金给乙方。
九、工程款的支付方式:
1、为保证工程进度、质量、安全文明施工,在乙方完成桩基工程量的50% ,经甲方审核后付给乙方已完成工程量60%的工程款。在完成桩基工程量的100%后。
2、经甲方认同乙方递交的结算结果付桩基工程全部工程款的95%,剩余工程5%质保金在乙方完成全部工程后一年内全部付清。
3、基础工程竣工验收合格后,乙方必须在15天内提交工程结算书,甲方收到结算书后,15天内审核完毕,若因乙方延期递交结算书而导致甲方无法审核,视为乙方认同甲方的结算结果,若因甲方延期审核结算书而导致乙方无法结算,视为甲方认同乙方递交的结算结果。
4、如甲方付款延迟,则按应付款的 %乘以天数计算滞纳金。
十、材料、设备的品牌及供应:
1、钢材采用链钢、湘钢、韶钢三大品牌。
2、水泥采用世达、金雷、海螺三大品牌。
3、钢材、水泥使用的品牌、型号、规格需经甲方认可才能使用。
4、工程所用的材料均由乙方负责采购、运输、保管、实验,并出具相关的合 格检测报告和依据;
十一、桩基工程验收及签证:
1、除一般技术性隐蔽签证以外,所有涉及到有关经济签证资料(包括隐蔽工 程验收资料,人工、材料、机械等单价签证等)乙方上报给甲方,签证程序按甲方规章制度执行。
2、隐蔽工程验收:隐蔽工程乙方应提前十二小时通知甲方现场代表,并提交 相应的自检材料。甲方现场代表接到通知十二小时内会同有关部门进行验收,验收合格后乙方方可进行下一道工序施工。乙方未经甲方验收自行隐蔽的,甲方有权要求复查,其返工损失费由乙方负责。甲方接到乙方书面通知十二小时内未进行验收的,乙方可自行隐蔽。
3、工程初验收:工程初验收由乙方会同甲方组织有关部门进行工程初验收工。
建造合同 篇5
长春图书馆分馆是长春图书馆在馆外设立的读者服务场所,在业务上接受长春图书馆的指导与检查,在行政上隶属其主管部门。为确保分馆工作的可持续发展,明确长春图书馆与分馆各自应承担的责任、权利及义务,经双方共同协商,达成如下协议:
一、长春图书馆的责任、权利及义务:
1、负责对分馆进行业务指导及人员培训;
2、负责技术支持,包括:计算机管理软件的选择、安装、技术指导、维护等;
3、首次提供图书500册;提供较新期刊1000册;
4、定期为分馆流通图书、期刊;
5、不定期为分馆提供文化信息共享工程的刻录光盘等资源。
二、分馆的责任、权利及义务:
1、提供一处面积不低于40平方米的馆舍;
2、保证年购书经费在20xx元以上或筹集有利用价值的书刊200册以上;
3、设专职或兼职工作人员,并保证工作人员的相对稳定;分馆工作人员调离时,应在有关人员的监督下清点藏书,办理交接手续;
4、分馆需与长春图书馆办理集体借书手续,每次可借200—500册书刊;
5、每年开馆时间不少于100天,每年发展读者不少于100人;
6、每年组织读者活动不少于2次。
7、书架(单面6层,每个书架可放置图书400册)需5个以上;期刊架(单面6层,每个期刊架可放置期刊24种)需2个以上,并配备相应的报纸架、阅览桌椅等专用设备;
8、在有条件的情况下配置计算机,并通过网络与长春图书馆实现资源共享;
9、做好各项业务统计工作,并及时上报长春图书馆,确保统计内容的准确性和完整性;
三、双方应严格遵守本协议,如一方未能遵守,另一方有权要求解除
四、协议有效期为一年,有效期满,双方对协议无异议,可自动延长
五、协议解除之后,分馆需返还长春图书馆为其配置的相关设备及文献。损坏或丢失设备需按原价进行赔偿;丢失、损坏长春图书馆的书刊需按长春图书馆的有关规定进行赔偿;
六、本协议未列事项,双方本着平等互利的原则协商解决
本协议一式两份,双方各执一份,协议自签字之日起生效。
长春图书馆 分馆
公章公章
建造合同 篇6
发包方(甲方)
承包方(乙方)
根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,发包方(以下简称甲方)和承包方(以下简称乙方),经协商同意签订本合同。
一、工程项目
1、工程地点:
2、承包范围:
3、工程承包面积约(按工程实量单结算)
4、工程单价:(大写)__
5、安装垃圾的清理与外运:
二、施工准备
(一)甲方
1、负责产品运输进场,选择合适的堆放地点。
2、为乙方进场提供方便和施工技术指导。
(二)乙方
1、负责进场前道路、运输设备及施工用电的协调准备工作。
2、组织施工人员、配件、施工机具的进场,提供收货人并到甲方备案,持乙方《身份证》及时验收安装材料。
3、编制人员计划及施工计划,如实提供工人数量人,填写《职工情况登记表》
4、负责给工人办理安全保险,送甲方备案。
5、提供工地需要的证件及材料。
三、工程期限
1、根据工程需要,商订总工期为__天(日历天),自__年__月__日开工至__年__月__日止;
2、甲方根据工程进度和质量要求按周对乙方进行考核,如达不到甲方要求,甲方有权责令乙方限期整改、罚款50~500元、直至解约清退。
3、如遇下列情况,经发包方现场代表签证后,工期相应顺延:
(1)按施工准备,不能提供产品进场的;
(2)不属包干系数范围内重大设计变更的;
(3)在施工中,因停电、停水或间歇性停电、停水3天以上(每次连续4小时以上),影响正常施工的。
(4)未按照合同规定拨付进度款,影响工程进度的;
(5)人力不可抗拒的因素而延误工期的。
四、工程质量
(一)本工程质量经双方研究要求到
(二)乙方必须严格按照施工图纸、建筑工程规范和标准及甲方要求施工,并接受甲方派驻代表的监督考核。
(三)乙方在施工过程中必须遵守下列规定:
1、乙方在安装过程中,如遇到产品堆放位置的确定,吊运方式、器械利用有关事宜的协调,均由乙方自己负责。
2、甲方除产品提供给乙方外,不提供任何配件、工具,乙方自理的配件必须合格,经甲方代表认可后方可使用。
3、乙方严格按《施工方案》组织施工,并根据甲方要求及时与工地负责人联系逐层验收,并将工地认可的《临时结量单》送到甲方备案,作为拨付进度款的依据。工程完工时,应会同甲方进行验收,并在甲、乙双方认可的工程结量单上签字,作为结款依据。
4、工程竣工后乙方按照规定对工程实行保修,保修时间自通过竣工验收之日算起。
5、严格按照工地的规定,出现安全、偷盗等问题乙方自己承担。
6、施工过程中出现违反操作规程或不服从管理的,甲方有权制止或经济处罚,严重者甲方有权将直接责任人清除出场。
五、建筑材料、设备的供应、验收和差价处理
1、有发包方供应以下材料、设备的实物和指标
2、除甲方供应之外的其他材料和设备由乙方自己采购。
3、由乙方提供的产品必须符合质量要求,不符合质量的要求的,应按照有关规定处理,其复验费用由提供材料、设备方承担。
六、工程价款的支付与结算
1、施工期间乙方凭工地签字的《临时结量单》向甲方申请工程进度款,工程进度款支付合同价款的__%,此款乙方应优先支付工人工资且自觉接受甲方的监督(乙方申请工程进度款应付《工程款分配表》),中途不支付任何进度款。
2、工程完工后工程价款达到%,剩余%的工程款年底前逐步支付给乙方。在交工验收后,滞留__%的质量保证金,待保修期满后一次性支付给乙方。
3、甲方恶意拖欠工程进度款,严重影响工程进度,造成乙方重大损失的.,由甲方承担。
七、工程验收
1、竣工工程验收,以相关部门制定的竣工验收规定及施工图纸、说明书、施工技术文件为依据。
2、工程竣工后,在保修期内,凡因施工造成的质量事故和质量缺陷应由乙方无偿保修并负全责。
八、违约责任
(一)乙方责任
1、工程质量不符合合同规定的,负责无偿修理或返工;
2、工程不能按照合同的工期交付使用的,应赔付甲方__%的违约金。
(二)甲方责任
1、未能按照合同履行自己应负的责任,除竣工日期须顺延外,还应支付乙方的实际损失。
2、不能按照合同规定拨付工程款,按合同规定赔付乙方__%的违约金。
九、纠纷解决办法
双方协商解决。双方协商不成,应按以下第项方式解决:
1、向劳动仲裁机关申请仲裁;
2、向人民法院起诉。
十、附则
1、本合同一式份,合同附件份。甲乙双方各执正本一份。
2、本合同自甲乙双方代表签字(加盖双方公章或合同章)认可后生效,工程竣工验收符合要求,结清工程款后自动终止。
3、合同签订后,甲、乙双方提出修改时,经双方协商一致后,可签订补充协议,作为本合同附件。
4、乙方在施工中发生一切安全事故与甲方无关。
5、附《田邦农科现场安装管理制度》、《施工方案》、《安装技术交底》作为该合同附件。
发包方(盖章)承包方(盖章)
代表人(签章)代表人(签章)
电话:电话:
__ 年___月__日
建造合同 篇7
甲方:
乙方:
因甲方工程需要,现委托乙方承建本水井工程,经甲乙双方商定签订合同如下:
一、 合同名称:荥阳市槐树洼村土地综合整治试点项目机井工程
二、 工程位置:荥阳市槐树洼村
三、 供水井数:五眼
四、 承包范围:
预计井深240米,井颈500mm,377mm螺纹管,工程包括内容:裸眼钻探、电测判层、确定井位、扩孔成井、井管安装、换浆洗井、抽水试验、取水化验、资料提交(按照现场监理的要求提供一套完整的竣工资料,一式五份2正3负)。
五、 预计工期乙方进场开工日算起35日。
六、 工程造价850元每米,乘以钻井深度,以上单价不包括税金(需提供材料发票)。
七、 付款:乙方进场开钻5日后甲方向乙方支付五万元整,工程施工到240m甲方向乙方支付五万元整,工程完工后付款80%,经业主验收后付款到95%,剩余5%质保金,一年后付清。(一年内若水井出现质量问题,乙方无偿维修)。
八、 双方责任:
甲方责任:
保证钻井施工现场三通(路、水、电)一平施工场地。 负责施工场地,道路、污水排放、占地青苗赔偿合因工程甲方对工程施工有意见,可以及时向乙方负责人反映,工建设与当地发生的一切事宜。 程竣工后五日内应及时组织验收。甲方负责钻井期间污水坑开挖现场平整。 施工人员进场施工,要加强劳动纪律、遵守甲方规章制度,
乙方责任:
爱护甲方公共设施,不得于当地群众发生矛盾冲突,责任后果自负。 负责全部成精材料的准备合运输包括水、电等费用。 负责钻探施工设备,工具的准备,并运输至工地。 钻井必须保证成井至甲方要求的出水量,若达到合适出水量,应及时与甲方沟通,若未能达到合同要求(干眼),乙方重新施工,期费用由乙方承担。 乙方进场后及施工过程中,要及时做好安全教育、安全警示、安全设施,若行为不当造成的一切安全事故及违法行为包括施工人员违反操作规程出现的一切事故由乙方承担,甲方概不负责。 按合同技术要求,工程项目如期完成施工任务,保证工程质量。
九、 合同自双方签字之日起生效。
十、 本合同一式四份,甲方两分乙方两份。
十一、 合同一经双方签字即生效任何乙方不得违约,若任何一方不是由国家政策方面原因,而单方中断合同时,应向另一方赔偿经济,赔偿费为合同额的30%。
甲方(公章):_________ 乙方(公章):_________
法定代表人(签字):_________ 法定代表人(签字):_________
_________年____月____日 _________年____月____日
建造合同 篇8
甲方: (以下简称甲方)
乙方: (以下简称乙方)
根据《中华人民共和国合同法》及有关法律、法规精神,甲、乙双方本着平等互利的原则,经友好协商一致同意签订本合同。
第一条 订购板房内容
甲方向乙方订购的活动板房内容为:
活动板房面积计算:
1. 板房面积=外墙面长X宽
2. 室外楼梯、走道面积=每层自然投影面积之和。
3. 雨棚面积=雨棚投影面积的一半。
4. 总面积=(1)+(2)+(3)。
5. 工程完工建成按实际面积结算。
第二条 合同金额
1.双层活动板房单价为元/m2,本单价为建设材料费,运输费和安装费用的总和,不包括土建及水电安装项目的费用。
2.其他项目:单层轻钢房单价元/㎡
3.合同总金额约(人民币): 元,人民币大写:
第三条付款方式
1. 钢构地梁、立柱、钢梁、檩条、屋架、墙板、屋面板等全部材料进场完毕,甲方应向乙方支付合同金额_30_%的进度款,计元人民币(大写:__)
2. 活动板房安装完工,甲方验收完毕10日内应向乙方支付合同金额__65__%的进度款,计___元人民币(大写:________);剩余5%的合同价款作为质保金,计_______元人民币
(大写:_____________________)
3. 质保期一年,到期后一个月内无息付清。(质保期以验收合格完毕后开始计算)
第四条 安装地点及工期
安装地点:__
1.安装布臵图详细见甲方确认平面布臵图
2. 相关工艺技术要求:(1)房间轻质隔板宽度必须保证120CM,隔板中间用T型铝条连接,且隔板必须完全封堵至顶板,保证密闭性。
(2)门需采用防盗门(3)室内楼梯采用钢制楼梯(不另计费用)其他各项施工标准与工艺必须要与你我双方在年月 日所签署合同建造的活动板房一致。
3.安装工期:_20xx_____年 _4__月 _1__日前全部安装完毕。
第五条 工期顺延
由于下列原因造成竣工日期延误,安装工期应顺延:
1.设计变更或工程量增加。
2一周内因停电造成停工累计八小时
3甲方不能按约定期限提供场地、清除障碍、疏通进场道路和接通施工用水用电。
4. 不可抗力:战争、动乱、空中飞行物体坠落或其他非甲乙双方责任造成的爆炸、火灾、水灾、以及台风(老式房屋七级以上为自然灾害新型房屋十级以上为自然灾害)大雨、地震等。
5. 甲方分包的工程,拖延了工程进度。
第六条 甲方责任
1.应在安装前两天做到场地平整和道路通畅,并做好活动板房的基础。进场当天,甲方至少应派一名代表到安装现场协助乙方顺利开工。
2.施工期间提供用水、用电的接口,水电费用由乙方承担。
3.应按合同第二、三条规定的时间和方法将款项付给乙方,如甲方未按期向乙方付款,甲方需付给乙方应付款的每天3‰的滞纳金。因此造成的停工,同时承担乙方误工费每人每天30元。
4.完工的当天,派一名现场代表到安装现场同乙方共同按合同及附件进行验收,并签署验收单,办理接收及结算手续。如甲方未到现场参与验收而自行启用本活动板房,则视为对本活动动板房安装质量符合合同要求的确认和验收手续的完成。
5.进场前,应对乙方提供的设计图纸予以确定。
第七条 乙方责任
1.约定的时间完成供应和安装任务。
2.按照工程通用产品的质量,满足使用要求。其中楼面承受负荷不小于150kg/㎡;如因质量问题给甲方及第三方造成的损失由乙方负责赔偿。
3.服务期限为一年,属乙方原因造成活动板房质量问题的,乙方予以无偿修补。
4.其他服务:乙方今后服务期满后发生的损坏或服务期内属于甲方原因造成的损坏,乙方负责予以修补,所需费用由甲方承担。
5.乙方安装期间属于乙方的原因造成的安装损失由乙方承担。
第八条 本合同未尽事宜由双方本着友好合作的精神协商后签订补充协议与本合同具有同等效力。
第九条 本合同所列附件是本合同的组成部分,与本合同有同等效力。
第十条 本合同在履行中如发生争议,双方协商解决,协商不成时,任意一方均有权向人民法院提起诉讼。
第十一条 本合同一式_两___ 份。甲乙双方各持 _壹__份,自签订之日起生效。
甲方(印章)乙方:
甲方代表签字: 乙方代表签字: 地址:地址: 电话:
签约时间: 年 月电话: 日 签约地点:
建造合同 篇9
甲方根据公司业务发展的需要,经与乙方充分协商,决定聘请乙方为甲方的注册建造师,乙方同意应聘,为了明确双方权利义务,根据《合同法》、《劳动法》、《劳动合同法》及其他现行相关法律法规,达成如下条款,以兹共同遵行。
一、聘用期限
甲方聘用乙方的期限为叁年。即自20xx年2月28日起至20xx年2月27日止。聘用期满,双方有意签订续聘合同,具体条件由双方另行商议。
二、双方权利义务
(一)甲方
1、为乙方提供上岗机会;
2、为乙方保管一级建造师执业资格证书、注册证书、注册章。
3、甲方保证乙方一级建造师注册证书的年检及时、有效,保证乙方继续教育等工作的及时进行。如果完全由于甲方原因发生乙方的一级建造师资格证、注册证丢失,甲方负责为乙方补办资格证、注册证。如果完全由于甲方原因发生乙方的一级建造师资格证、注册证吊销,甲方赔偿乙方相关损失。如因乙方自身原因导致后果,甲方概不负责。
4、本合同未尽事宜发生时,甲方需及时通知乙方,保证乙方的知情权,并经过相互协商共同解决。
(二)乙方
1、应于合同签订后3日内向甲方提供其一、二寸彩色相片各10张、身份证复印件、建造师执业资格证及(或)考试合格证原件、毕业证原件、职称证书原件、其他执业资格证和注册证书及原项目经理证书和安全考核合格证原件(如有)、原注册单位的解聘证明原件等相关的证明材料、以及其它甲方注册过程中需要的一切材料;乙方对其提供的证书及材料负责。
2、配合甲方进行建造师上岗所应参加的各类培训;
3、有项目上岗的,若有要求建造师必须到场的需参加;
4、乙方不得在同行业中其他单位岗位任职。
三、工资待遇
聘用期间甲方支付乙方每年基本报酬为人民币壹万伍仟元整,每月付壹仟元整,年底结清。若有项目上岗,按照工程项目规模每月发放补贴,补贴标准结合市面价格面议。工资发放时间同甲方管理人员发放时间。
四、保密
乙方在聘用期内应保守甲方商业秘密,不得泄密,并自愿承担泄密而导致甲方名誉及经济的一切法律和经济损失。
五、合同的解除
1、协议到期后,合同自动解除。
2、协议解除后,甲方应对乙方办理注册变更手续提供便利条件。
3、在下列情况下,乙方有权提前解除协议:
(1) 甲方不能按期支付工资;
(2)甲方有其它违约行为。
4、乙方违反本合同约定,经甲方指出后十日内不纠正的甲方有权单方面解除合同。因乙方自己的原因提前解除合同的,乙方应返还甲方在初始注册时给予的10000元人民币的奖励(如有),赔偿甲方为乙方支付的相关培训费用。
六、违约责任
除本合同另有约定以外,任何一方均不得单方终止合同。如有一方单方终止合同的,应向对方偿付违约金人民币壹万元。
七、合同生效及文本
本合同经甲、乙双方签署后生效,一式两份。甲乙双方各执壹份,具有同等法律效力。未尽事宜双方友好协商。
申请人:
建造合同 篇10
甲方(称发包人):
乙方(称承包人):
根据《中华人民共和国合同法》、《中华人民共和国建筑法》及其他相关法律、法规规定,为明确双方的责任与义务,维护双方的合法权益,经甲、乙双方协商一致,特签订本合同。
一、 工程概况:
工程名称:华容县治河渡镇中心小学食堂 建筑面积:385平方。(详见蓝图)
二、 基础工程
1、 主体工程
施工图中现浇柱、梁、板、天沟、雨篷、预制构件、楼梯、木模工。
2、 防水工程
卫生间防水用聚氨酯涂膜,屋面下水管瑶敷设。
3、 装饰工程
梯级瓷砖、外墙瓷砖、外墙漆、内外粉饰。
4、 水电工程
按工装要求水电铺设到位,按甲方要求。
三、 工程质量及验收
1、
2、 内墙粉饰必须平整,棱角分明。
四、 工程承包范围方式及价格
1、 承包方式:按照施工图、变更图、水电工、明沟散水一次性包工给承包人。
2、 承包设备:机械设备、顶木、脚手架、钢筋工、木模工、模板、外贴、防护网、钉子、铁丝等。
3、 承包价格:本工程按照施工图及房屋建造合同书每平方为叁百元整(¥300元)。
五、 甲乙双方的责任与义务:
搞好水电到位,图纸三份。 买好施工人员的意外伤害保险。 协助甲方协调周边的关系。
六、 工期及顺延:
1、 开工日期古历20xx年12月20日,竣工时期古历20xx年2月21日,合同工期总天数50天。
2、 如遇不可抗拒之原因造成误工时,施工日期顺延。
七、 付款方式:
工程款按施工进度分期付款(现金支付)
机械设备 内粉饰完工付叁万元整。 外粉外贴完工后付叁万元整。 余款竣工验收合格,留足保证金一年后付清,保证金为总工资3%。
八、 本合同自双方签字之日起生效,工程款全部结清之时失效。
九、 本合同一式肆份,甲乙双方各执两份。
甲方(签字):
乙方(签字):
年月日:
建造合同 篇11
国家财政部出台新的《企业会计制度》和企业会计准则—建造合同等相关企业会计准则的试行。要求施工企业按照建造合同进行企业的会计核算。企业会计准则—建造合同针对性较强,主要针对施工企业的行业管理特点:产品单一,生产周期长,有的建筑物施工周期要跨越不同会计年度。
一、建造合同的会计核算主体
由于施工企业具有生产分散、 流动性较强等特点,其组织结构相 对于其他企业来说,有其独特之处。目前,改制后的国有施工企业一般分为四级核算单位,即股份有限公司总部、分公司、项目经理部。
股份有限公司作为独立的法律主体,拥有法人财产权,能够独立地承担民事责任,直接对投资者和国家主管财政机关及有关部门发生经济联系,但由于投资人的一部分权益已不在公司的会计账簿上反映,因此,只有汇总其下属的分公司的会计报表才能完整地反映出股份公司的净资产和财务状况,因此,股份公司并不直接进行建造合同的会计核算。
分公司由原来的工程处改造而来。分公司不是独立法人,但它是一个独立的经济实体,拥有相对独立的财产和生产经营资金,其资金的主要来源是股份有限公司拨付的,也包括从外部负债取得的资金。但分公司作为管理机构,并不直接核算工程收入和成本,因此,不能成为建造合同的会计核算主体。
项目经理部是施工企业的特殊的组织形式,是分公司在工程项目所在地临时组建的工作机构,其主要任务是按照建造合同与发包单位办理工程结算,并收取工程价款,向工程队拨付备料款,保证其按时完成施工任务,可以说,项目经理都是整个工程项目的负责人,通过对资金的管理,最能直观地反映工程收入和成本,所以,应该是建造合同的主要会计核算主体。
二、执行建造台同应做的各项基础工作
1、加强对建造合同的管理。实行具体会计准则——建造合同的一个重要前提,就是发包单位与承包企业要规范建造合同的签订,保证建造合同的执行,减小合同风险,维护正常的市场经济秩序,促使双方经济利益的及时流入。此外,施工部门应加强对合同执行全过程的监督管理,对因变更设计、非可控因素造成的工程造价的变化应及时取得发包单位的签认,以便财务部门及时、准确地计算合同收入,真实反映施工企业的经营业绩。
2、提高对成本的预测与控制能力。施工企业应利用实施建造合同的契机,将成本预测与控制有机地结合起来。目前施工企业应深化目标成本管理。目标成本作为企业的一项重要的经营管理目标,同时兼有目标属性和成本属性。目标成本应由会计部门会同行政管理、采购、劳动工资、工程等有关责任部门,根据企业的经营目标,在对工程项目建设的内外环境进行认真分析、研究的基础上共同确定。制定目标成本,既有助于在实行具体会计准则——建造合同时准确估计合同总预算成本,又可加强成本管理,挖掘企业潜力,还可用于评价和考核企业各部门的工作业绩。可以说,目标成本是实现企业内部机制与市场对接的关键。
3、做好建造合同成本核算的各项基础工作。首先,应建立各种财产物资的收发、领退、转移、报废和清查制度;建立、健全与成本核算有关的各项原始记录和工程量统计制度;制定或修订工时、材料、费用等各项内部消耗定额;完善各种计量检测设施,严格计量检验制度,使成本核算具有可靠的基础。其次,必须及时、系统地核算和反映实施建造合同研发生的各项经济业务,对于未完成合同实际发生的合同成本必须准确地进行归集和登记,对于未完成合同尚需发生的成本必须进行科学、合理的预计。应当划清当期成本与下期成本的界限、不同成本核算对象之间的界限、未完合同成本与已完合同成本的界限,不得以估计成本、预算成本或计划成本代替实际成本。
三、会计准则区别于现行财务核算:
1、该会计准则明确指出由于“建造合同的开工日期与完工日期通常分属于不同的会计年度,因此本准则的主要问题是将合同收入与合同成本分配计入实施工程的各个会计年度”。同时明确规范:“如果建造合同的结果能够可靠地估计,企业应根据完工百分比法在资产负债表日确认合同收入与费用”。
施工企业现行财务核算的要求是:在会计核算期末必须依据经建设单位确认的年度工程结算书,在资产负债表日确认合同收入。在市场经济条件下,对于需要签字确认的经济文件,任何单位均都很慎重,因此很多合同的建设单位不愿在年度工程结算书上签字确认施工企业该年度完成的工作量,这就导致目前很多施工企业年度工程结算书是没有经建设单位确认的工程结算文件。施工企业一般习惯上把此类年度工程结算书称为“内结”。而依据“内结”年度工程结算书进行的财务核算,审计部门均提出质疑。依据建造合同会计准则:施工企业在建造合同的结果能够可靠地估计的前提下,企业可根据完工百分比法在资产负债表日确认合同收入和费用。意味着跨年工程的年度工程结算可以无须再经建设单位确认。该准则这一要点体现:在建造合同执行过程中的不同会计年度的合同收入和费用的划分,施工企业可自行确认,并可作为资产负债表日――即会计年度财务核算的依据。该准则这一要点体现建造合同执行过程中的核算程序简化,但与此相对应的是:该准则对建造合同执行结果的核算程序的强化。
2、设置“工程结算”科目,核算根据合同完工进度已向客户开出工程价款结算账单办理结算的价款。明确规定该科目是“工程施工”科目的备抵科目,合同完工后,“工程结算”和“工程施工”科目余额对冲后结平。
该准则要求设置“工程结算”科目,核算施工企业向建设单位开出工程价款结算账单办理的价款,并明确规定该科目是“工程施工”科目的备抵科目,在合同完工后“工程结算”和“工程施工”科目余额对冲后结平。该准则对上述会计科目的设置和账务处理的特殊规定,体现对建造合同执行结果的核算程序的强化,体现对建造合同执行过程的系统跟踪核算管理的特殊强化。施工企业现行财务核算对建造合同收入和费用,强调的是会计年度的核算结果,因此,在会计账务处理上,无论工程项目是否跨年,在会计年度核算期末,按权责发生制原则,收入和费用均结转本年利润核算,对跨年工程项目的逐年合同收入和费用在会计账务处理上不作连续的会计记录。如要对跨年竣工工程项目的收入和费用进行竣工工程成本考核,须通过对历年会计报表反映数据进行整理和统计。施工企业现行会计账务核算模式反映的是计划经济体制关注年度计划执行情况的要求。很明显不适应市场经济条件下,以经济合同规范经济行为的原则。
3、开单结算的会计处理不同。本准则针对开单结算的处理应考虑到提供的信息量因素及有用性等方面的原因,在会计处理上有了很大的改变。施工企业会计制度规定将开单结算与收入确认同时进行核算,即开单结算时借记 “应收账款”科目,贷记 “工程结算收入”科目,同时结转已结算工程成本,借记 “工程结算成本”科目,贷记“工程施工”科目。
四、施工企业实行本准则面临的问题
1、企业的收入与赋税时间不一致。本准则是按完工进度确认合同收入,虽然符合权责发生制的要求,更能准确地核算施工企业的经营业绩,但确认的利润要立即缴纳所得税,在目前工程款收入远远滞后于工程完工进度的情况下,企业需要垫付大量的资金用于赋税,这对于资金本来就捉襟见肘的施工企业,好比雪上加霜。
2、施工企业的管理水平有限。实行建造合同,并不仅仅与财务部门有关,需要各部门的配合,准确预测合同收入和成本,及时办理工程结算,严格控制成本开支,而目前施工企业的管理水平还很低,管理手段也很落后,有可能降低建造合同会计核算的准确性。
3、建造合同的不确定性相当大。由于建筑工程项目价值较大,生产周期很长,经常发生工程变更,引起合同总造价的变化;此外,合同实际成本受市价的影响也较大,难以准确预计,影响了完工进度的计算。
4、目前我国的建筑市场还不规范。最近几年,国家通过制定一系列的法律法规来规范建筑市场,营造公平的市场竞争环境,收到了良好的效果,但发包方故意拖延工程结算时间,拖欠工程款的现象时有发生,影响了施工企业的现金流入,阻碍了企业的进一步发展。
建造合同 篇12
甲方:
乙方:
经甲乙双方协商,就双方共同建设大棚事宜达成如下合同条款,供双方共同遵守:
一、工程概况:
1、工程名称:
2、建设地点:
3、开工日期:__年__月__日
4、竣工日期:__年__月__日。
5、合作方式:乙方出资人民币伍拾万元与甲方共同建设日光温室大棚90栋,大写玖拾栋。(本项目共建设日光温室大棚290栋,双方只合作90栋。)因乙方不懂工程,由甲乙双方协商,甲方愿意给予乙方伍拾万元红利,该项目利润大小与乙方无任何关系。
6、合作内容:乙方出资人民币伍拾万元建设大棚项目,甲方负责建设,项目竣工验收合格后,甲方向乙方支付人民币伍拾万元本金及人民币伍拾万元合作利益分红。
二、双方责任:
1、甲方负责建设该项目,并执行与农业经济产业化股份有限公司签定的合同条款。
2、甲方负按本合同要求的付款金额及时间向乙方支付共计壹佰万元(该款包括乙方投资本金及利益分红)。
3、甲方负责建设项目的全面工作。
4、乙方负责及时付予甲方全额的投资款人民币伍拾万元。
三、甲、乙双方商议本项目在__年__月__日完工前甲方保证返还乙方伍拾万元投资款及伍拾万元的利益分红。如因甲方工程出现的一切后果由甲方自行承担,与乙方无任何关系。
四、甲方在__年__月__日前必须付予乙方人民币壹佰万元,如到期未能将款付予乙方,甲乙双方商议,由甲方每月按十万元的违约金支付给乙方。
五、其它:
1、如在履行合同中出现争议,双方友好协商解决。如协商未果,可依法向所在地人民法院提起诉讼。
2、本合同未尽事宜双方协商解决,并可签定补充合同,补充合同与本合同具有同等的法律效力。
3、本合同一式贰份,甲乙双方各执一份,自签字之日起生效,具有同等的法律效力。
甲方签字:
乙方签字:
__年__月__日
建造合同 篇13
甲方:
乙方:
甲方在 路建造(加层)房屋一栋,框架共三层。预计建筑面积 平方米,采用包工形式由乙方泥木共同承建,为确保工程质量,根据建筑法规定,经甲方乙双方协商民,达成以下条例:
一、确保工程质量,泥木施工时互相配合,确保进度和质量,做到模板平整,柱子垂直,墙体平整垂直。
二、施工范围:木工自带模板、铁钉等材料。 泥工:做墙、粉刷、扎钢筋、浇水泥等。
注:(四周做墙)内、外粉刷,卫生间墙体及粉刷,不粉刷天棚、楼面、楼梯子。(商品水泥)
三、付款与结算方式:
浇完一层楼面,甲方预付泥工本层70%,墙面粉刷完,付20%,全部结束再付清10%,木工付本层的90%,房屋结束后,按房屋的投影建筑面积,泥工按每平方米 元计算,木工按 元/平方米计算。
四、建筑施安全
乙方应要求施工人员安全施工,如因施工人员违反建筑
五、每层浇水泥时甲方应结乙方每人补助中餐生活费20元,伙食由乙方自理。
六、未尽事,双方本着友好原则协商解决。
七、本合同一式叁份,甲乙双方各执一份,双方签字后生效。
甲方:
乙方: 泥工:
年月日:
木工:
建造合同 篇14
甲方:
乙方:
根据《建筑法》,《经济合同法》及有关法律法规,甲乙双方在平等自愿,公平合理,互惠互利的原则下,通过双方协商就私人住宅建房工程达成协议,希望双方严格执行,共同遵守。
一、 建筑工程概况:
1.工程名称:______
2.地点:______
二、工程造价:
1.全部工程手工费合计人民币,大写:______小写:______。
2.每平方米建筑面积______元,含抹内外墙面、搞地平、起隔墙等。
三、承建方式及施工准备
1.甲方将其住宅工程以包工的方式承包给乙方承建。
2.甲方应及时提供工程所需全部材料。
3.乙方自带泥工、木工、钢筋工、内外粉刷、盖瓦等建筑活动所需的一切工具,包括施工用的搅拌机、震动器等施工机械以及模板、搭架等。雨天做好遮雨措施,避免在捣制楼面时下雨影响楼面质量。
四、施工安全要求
1.乙方施工人员必须具备一定的房屋建筑施工经验,以确保乙方所承揽建设的.工程符合建设施工所要求的质量和技术要求。
2.乙方必须重点抓好工程的质量和安全施工,严格按照抗震安居房屋建设标准建房,在施工期间,以确保工程质量和安全,控制好各种可能存在的危险因素,消除安全事故的隐患,随时对工程质量、进度、安全三大要素加强全面检查和督促。
五、工程质量。
1.乙方按甲方提供的图纸(要求)施工,若发现图纸有不合理部分,经甲乙双方共同协商,在取得明确一致的施工方案后乙方方可再进行施工。
2.工程质量应达到抗震安居房屋建设评定标准的合格条件。建房后的墙体、窗户安装、门等要做到平整、光滑,墙砖、地面做到平滑,杜绝空鼓,符合相关标准。墙面、屋顶、窗沿口等不得出现开裂、渗水等现象。
3.因乙方方面自身原因达不到工程质量合格条件,乙方应按甲方及其委派人员的要求返工、修改和重作,并承担导致返工、修改、重作等人工、材料等所有费用。返工、修改后仍不能达到约定的合格使用条件的,乙方承担工程质量违约责任。
六、建房工期:
建房工期为______ 天,自______年______月______日开始施工算起。开工起______个工日完工。
七、付款方式:
乙方进场后,甲方将按工程进度付款。完工后按实做工程量,根据陕西省建筑工程面积结算规定办法进行面积结算。
1.基础+0付百分之______。
2.主体封顶后付百分之______(可根据楼层给付)
3.装饰工程完工后付百分之______(可分冰给付)
4.其余款项待验收交工后扣除5%的保修金外—次付清。
八、违约责任和争议的解决办法
1.乙方承揽建设工程的质量达不到约定要求的,乙方要无偿修理、返工或重作。造成损失的,乙方要赔偿所有损失。因乙方原因有其它致使合同无法履行情形的,乙方要赔偿因其违约给甲方造成的一切损失。
2.甲乙双方因履行本合同发生争议,应耐心协商解决。如经协商仍无法解决的,双方同意提请劳动仲裁委员会进行仲裁。
九、合同的生效与终止。
1、本合同一式贰份,甲乙双方当事人各执壹份。
2、本合同自签订之日起生效。
以上合同,双方必须共同遵守。如经双方协商同意签订补充合同,补充合同与该合同具有同等法律效力。
甲方签字:
建造合同 篇15
原告:______________有限公司,住所地:________市__________路_________室。
法定代表人:______________,_____________有限公司董事长。
被告:_________________,男,________年________月________日出生,汉族,住__________市__________区__________路_________号。
诉讼请求
一、判令被告支付原告工程款_________元,违约金_________元;
二、本案诉讼费由被告承担。
事实与理由
原告于________年________月________日同被告签订《建筑装饰装修工程施工合同》,合同约定由原告承包被告发包的_____________项目,合同价款为人民币_________万元,双方约定合同生效后由被告分四次向原告支付,具体付款方式为:_________________签订合同当日支付_________万元;本项目二楼、三楼地下室及一楼后包房完工支付_________万元;项目整体完工后三个月至一百天内支付_________万元,并约定如在一百天后支付每延期一天被告应按照_________元/天的标准向原告支付滞纳金(违约金);工程验收_________个月后_________天内支付剩余_________万元。合同签订后,原告如约履行了合同义务,而被告却在支付第一笔合同价款和第二笔价款的一半(即_________万元)后以种种理由推拖支付剩余款项。由此给原告造成了巨大的经济损失,为维护原告的合法权益,特依据《中华人民共和国民事诉讼法》第119条之规定诉至贵院,请依法判决,以维护原告的合法权益。。
此致
__________市__________区人民法院
具状人:______________
________年________月________日
建造合同 篇16
企业会计准则——建造合同
引言
1.本准则规范建造承包商建造工程合同的会计核算和相关信息的披露。
2.由于建造合同的开工日期与完工日期通常分属于不同的会计年度,因此,本准则的主要问题是将合同收入和合同成本分配计入实施工程的各个会计年度。
在一个会计年度内完成的建造合同,应在完成时确认合同收入和合同费用。
定义
3.本准则使用的下列术语,其定义为:
(1)建造合同,指为建造一项资产或者在设计、技术、功能、最终用途等方面密切相关的数项资产而订立的合同。
(2)固定造价合同,指按照固定的合同价或固定单价确定工程价款的建造合同。
(3)成本加成合同,指以合同允许或其他方式议定的成本为基础,加上该成本的一定比例或定额费用确定工程价款的建造合同。
(4)完工百分比法,指根据合同完工进度确认收入与费用的方法。
合同分立与合同合并
4.一般情况下,本准则适用于单项建造合同。
5.如果一项建造合同包括多项资产,在同时具备下列条件的情况下,每项资产应分立为单项合同处理:
(1)每项资产均有独立的建造计划;
(2)建造承包商与客户就每项资产单独进行谈判,双方能够接受或拒绝与每项资产有关的合同条款;
(3)每项资产的收入和成本可单独辨认。
6.一组合同无论对应单个客户还是几个客户,在同时具备下列条件的情况下,应合并为单项合同处理:
(1)该组合同按一揽子交易签订;
(2)该组合同密切相关,每项合同实际上已构成一项综合利润率工程的组成部分;
(3)该组合同同时或依次履行。
合同收入
7.合同收入包括:
(1)合同中规定的初始收入;
(2)因合同变更、索赔、奖励等形成的收入。
8.合同收入应以收到或应收的工程价款计量。
9.合同变更指客户为改变合同规定的作业内容而提出的调整。因合同变更而增加的收入,应在同时具备下列条件时予以确认:
(1)客户能够认可因变更而增加的收入;
(2)收入能够可靠地计量。
10.索赔款指因客户或第三方的原因造成的、由建造承包商向客户或第三方收取的、用以补偿不包括在合同造价中的成本的款项。因索赔款而形成的收入,应在同时具备下列条件时予以确认:
(1)根据谈判情况,预计对方能够同意这项索赔;
(2)对方同意接受的金额能够可靠地计量。
11.奖励款指工程达到或超过规定的标准时,客户同意支付给建造承包商的额外款项。因奖励而形成的收入,应在同时具备下列条件时予以确认:
(1)根据目前合同完成情况,足以判断工程进度和工程质量能够达到或超过既定的标准;
(2)奖励金额能够可靠地计量。
合同成本
12.合同成本应包括从合同签订开始至合同完成止所发生的、与执行合同有关的直接费用和间接费用。
13.合同的直接费用包括:
(1)耗用的人工费用;
(2)耗用的材料费用;
(3)耗用的机械使用费;
(4)其他直接费用,包括有关的设计和技术援助费用、施工现场材料的二次搬运费、生产工具和用具使用费、检验试验费、工程定位复测费、工程点交费用、场地清理费用等。
14.间接费用是企业下属的施工单位或生产单位为组织和管理施工生产活动所发生的费用,包括临时设施核销费用和施工、生产单位管理人员工资、奖金、职工福利费、劳动保护费、固定资产折旧费及修理费、物料消费、低值易耗品摊销、取暖费、水电费、办公费、差旅费、财产保险费、工程保修费、排污费等。
15.直接费用在发生时应直接计入合同成本,间接费用应在期末按照系统、合理的方法分摊计入合同成本。
16.与合同有关的零星收益,例如合同完成后处置残余物资取得的收益,应冲减合同成本。
17.合同成本不包括下列费用:
(1)企业行政管理部门为组织和管理生产经营活动所发生的管理费用;
(2)船舶等制造企业的销售费用;
(3)企业筹集生产经营所需资金而发生的财务费用。
18.因订立合同而发生的有关费用,应直接确认为当期费用。
合同收入与合同费用的确认
19.如果建造合同的结果能够可靠地估计,企业应根据完工百分比法在资产负债表日确认合同收入和费用。
20.固定造价合同的结果能够可靠估计是指同时具备下列条件:
(1)合同总收入能够可靠地计量;
(2)与合同相关的经济利益能够流入企业;
(3)在资产负债表日合同完工进度和为完成合同尚需发生的成本能够可靠地确定;
(4)为完成合同已经发生的合同成本能够清楚地区分和可靠地计量,以便实际合同成本能够与以前的预计成本相比较。
21.成本加成合同的结果能够可靠估计是指同时具备下列条件:
(1)与合同相关的经济利益能够流入企业;
(2)实际发生的合同成本,能够清楚地区分并且能够可靠地计量。
22.企业确定合同完工进度可以选用下列方法:
(1)累计实际发生的合同成本占合同预计总成本的比例;
(2)已经完成的合同工作量占合同预计总工作量的比例;
(3)已完合同工作的测量。
23.采用累计实际发生的合同成本占合同预计总成本的比例确定合同完工进度时,累计实际发生的合同成本不包括下列内容:
(1)与合同未来活动相关的合同成本,例如施工中尚未安装、使用或耗用的材料成本;
(2)在分包工程的工作量完成之前预付给分包单位的款项。
24.当期完成的建造合同,应按实际合同总收入扣除以前会计年度累计已确认的收入后的余额确认为当期收入,同时按累计实际发生的合同成本扣除以前会计年度累计已确认的费用后的余额确认为当期费用。
25.如果建造合同的结果不能可靠地估计,应区别以下情况处理:
(1)合同成本能够收回的,合同收入根据能够收回的实际合同成本加以确认,合同成本在其发生的当期确认为费用。
(2)合同成本不可能收回的,应在发生时立即确认为费用,不确认收入。
26.如果合同预计总成本将超过合同预计总收入,应将预计损失立即确认为当期费用。
披露
27.企业应披露下列与建造合同有关的事项:
(1)在建合同工程累计已发生的成本和累计已确认的毛利(或亏损);
(2)在建合同工程已办理结算的价款金额;
(3)当期确认的合同收入和合同费用的金额;
(4)确定合同完工进度的方法;
(5)合同总金额;
(6)当期已预计损失的原因和金额;
(7)应收帐款中尚未收到的工程进度款。
附则
28.本准则由财政部负责解释。
29.本准则自1999年1月1日起施行。
建造合同 篇17
第一条定义
“业主”指___________________________。
“承包商”指_________________________。
“工厂”指在附录_________中指定的构成固定设备的全部机器、设备和材料。
“工地”指按本合同用于建造工厂的全部土地。
“工程”指承包商按本合同实施的工程。
“合同价格”指业主向承包商支付的全部工程款项。
第二条承包商的职责
1.承包商应负责设计、筹划以及在工地上建造工厂。
2.除了业主根据第_________条提供的项目和设施,承包商应提供所有为使工厂成功建造所必需的设备、材料、工具、设施、劳工和服务。
3.承包商应根据附录_________中的日程安排施工。
4.承包商应根据附录_________中的规定为业主培训工厂设备的操作和维修人员。
5.承包商应向业主提供附录_________中规定的备件。
6.承包商应向业主提供附录_________中指定的维修设备。
第三条业主的职责
1.业主应提供工地,并在本合同有效期内允许承包商自由地、不受干扰地出入该工地。
2.业主应按时提供附录_________中指定的物件和设施。
3.业主将从有关部门获取为工厂建造、设备运行所必需的执照和许可证,包括承包商雇员的工作许可证。
4.业主应按第_________条中规定的合同价格向承包商支付工程款项。
第四条合同价格
1.在本合同生效后_________天内,业主应向承包商支付金额为合同价格,作为承包商完成该工程并承担本合同规定的所有义务的全部报酬。
2.合同价格不再上调,完成工种的成本风险应由承包商承担,商定合同价格时应认为承包商已获得全部信息并已把所有可能影响成本的因素估计在内。
第五条设计图样
1.承包商应根据合同,在附录_________规定的时间内向业主提交工厂建造所需的图样,供业主审批。业主应在收到这些图样后一个月内,对图样进行审核,并作出批准或不批准的决定。
3.业主或承包商互相提供的所有图样和技术资料,收到方应作为机密文件对待,除非另有商定,收到方不得将这些图样和资料用于与本合同无关的其他目的。
第六条检验
1.承包商应该按法律和正常的工程惯例的要求,负责工厂所有的检验和试验工作。
2.业主有权在任何适当时间对建造中的工厂的材料和工艺进行检验和测试,费用自理。这种检验或测试不能免除承包商在合同中应尽的任何义务。
3.完工后的工厂应由业主进行检验和测试;工厂何时可以测试,承包商应提前以书面形式通知业主。
4.承包商应根据业主的合理要求,为彻底而有效的检测提供所需要的协助、劳力、材料、电力、燃料、设备、备用品和仪器。
第七条工地
1.承包商应在工地上提供所有令业主满意的材料、劳力、设备、服务和便利,以便顺利施工和完工。
a.建筑设备;
b.工地上使用的运输工具,包括临时道路;
c.保护人员和财产安全所需的篱笆、灯光、岗哨以及所有其他材料和服务;
d.为材料和施工人员(包括业主雇员)提供临时仓库、办公室和其他房屋建筑;
e.在整个工程移交之前提供电话、灭火设备和急救设备;
f.供施工人员使用的卫生设备和食堂。
3.承包商应遵守当地法律规定的所安全及其他条例。
4.无论何时,承包商都不应在业主的房产及其邻近建筑物、车道和街道上堆积施工用建筑材料和建筑垃圾,工程完工后,应从建筑物及其周围清除所有用剩的材料,保持工地和工厂安全、整洁,以备使用。
第八条承包商的工作人员
1.承包商将自费为其全部工作人员提供饮食、交通及一切必要的便利。
2.合同签署后,承包商应指定一名项目经理,在工程进行过程中全权代表承包商。他将在工作时间内坐镇施工现场。业主向项目经理发出的所有指示,如同发给承包商本人一样,同样具有约束力。
3.如果业主认为工地上承包商的雇员品行不端、不能胜任工作或有失职行为,可要求承包商将此人调离或更换。
第九条责任
1.在工厂被最终验收之前,承包商应对工厂的任何损失或损坏负责,并自费将其修复,直至业主满意。然而,如果根据本合同,这类损坏的责任不在承包商,而业主要求予以修复,承包商应按业主指示办理,但费用由业主负担。
2.在最后验收合格证书签发之前,凡因承包商或其分包商的疏忽,或设计、材料或工艺上的缺陷而产生的任何财产损失或人身伤害,承包商应向业主赔偿,并保护业主免受由此而产生的各种诉讼、索赔、要求或费用支出。
3.如果业主因某种原因遭受索赔或诉讼,而按本条款规定承包商应该或可能对该事由承担法律责任,则业主应立即书面通知承包商。承包商应以业主名义接手并通过谈判处理解决或能由此而产生的诉讼,并承担一切费用。如承包商要求,业主应向承包商提供承包商为处理此类索赔或诉讼所需要的所有资料和帮助。
第十条_____
1.在不限制承包商责任的情况下,承包商将自费投保下列险:
a.机器设备从工厂交货到目的地的运输险。
b.为承包商和分包商的所的雇员投保雇员赔偿险,或者根据适用的法律和法规投保类似的法定社会_____。
c.防备财产损坏或人身伤害的产品责任险,期限到维修期结束,每次事件的金额不少于_________美元。
d.对承包商或其分包商在执行本合同中使用的所有_____投保综合汽车责任险。
第十一条完工
1.一俟工厂的全部建设和安装工程完工,承包商应通知业主,并根据附录______的规定进行机械安装完成测试工作,直至业主满意
2.测试圆满结束后,业主应签发一份完工证明书。在完工证明书签发之前,不得给工厂进料。
3.如果在建造和安装中出现不影响完成安装的小缺陷,或者在测试中测出不影响工厂开工的缺陷,业主应签发完工证明书,而承包商则有义务尽快修复这些不足之处。
第十二条最后验收
1.完工证明书颁发之后,承包商应提前_________天将工厂性能测试的时间通知业主。
2.为使测试准时开始,业主应按附录_________中的要求提供原料和其他设备,而承包商应按通知的时间开始性能测试。
3.性能测试将按附示_________的规定进行。测试成功后,业主应签发一份最后验收证明书,证明工厂已从证书签发日起移交业主
4.如果工厂未能通过性能测试,承包商在进行他认为必要的调整之后,应在业主在场的情况下重新进行测试,时间由双方商定,条件照旧。
5.在最后验收合格证书签发之前,工厂不得投入商业性运转。如工厂未能通过性能测试,业主仍可酌情颁发最后验收合格证书,条件是承包商必须尽快纠正工厂存在的问题。
第十三条违约赔偿金
1.如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录_________的规定向业主支付违约赔偿费,费率不超过合同价格的_________%。
2.如果承包商因自身的原因未能在合同生效后的_________个月内获得整个工厂的最后验收合格证书,承包商须根据附录_________的规定向业主每月支付相当于合同价格_________%的拖延赔偿费,但最多不超过合同价格的_________%。
3.承包商应根据附录_________规定的格式开立一份以业主为受益人、金额为合同价格_________%的保证书,作为其履行本条款项下义务的保证。
第十四条保修
1.承包商保证,在最后验收合格证书签发日起_________个月内或本合同生效日期_________个月内(以先到日期为准),所提供的工厂无设计、材料和工艺上的缺陷。
2.发现问题后,如果承包商的代表在现场工作,业主应在_________天内按本条款以书面形式向承包商提出全部要求;如果承包商的代表不在现场,业主应在_________天内以航空邮件将确证材料发往承包商总公司。承包商应更换或修理所有有缺陷的零部件。为此,应允许承包商随时自由出入工地,检查缺损部件,使其能履行本保修条款。如果承包商因某种特殊情况未能在适当期限内进行双方同意的补救工作,业主有权自行修复,但费用由承包商负担。
3.本保修的先决条件是,业主须按承包商的指示和具体规定的性能参数对工厂进行装备、操作和维护。如果业主未经承包商同意试图自行修正,则本保修条款无效。
4.本保修条款不包括因自然损坏的物件,也不包括使用寿命不到_________个月的消耗品或类似物件。
5.如果承包商遵照上更换任何设备、材料或工艺,则本保修条款的规定也适用于经修理或更换的设备、材料或工艺,期限为从修理或更换完成之日起1年。
第十五条专利权和专利使用费
1.承包商应全力保护业主在使用其提供的工帮时免遭因侵犯第三方的专利、设计或权而面临的诉讼、索赔、要求和各种费用。
2.如果承包商提供的工程设计、工厂设备的制造和供应以及在工程建造中实施的工作或使用的方法涉及了第三方的专利,他也应向终第三方支付按许可证或许可知要款规定应支付的所有费用、专利使用费和其他款项。但是,如果业主在经营或使用该厂或其中任何部分时涉及了第三方的专利,他应向第三方支付按许可证或许可条款规定应支付的所有费用、专利使用费和其他款项。
第十六条暂停
1.业主有权随时向承包商发出书面通知,指示其暂停工程的任何部分或整个工程,如果暂停期超过_______天,则按合同第______条规定作终止合同处理。
2.如果业主未能按照本合同在规定日期_________天内向承包商支付任何款项,或者如果承包商因业主在履行合同上的失误而被中断或拖延了工程的进行,承包商有权暂停执行本合同。
3.如果工程按本条款规定暂停,承包商有权收取附加费用,以补偿由于此类暂停、中断和拖延,以及本合同的合理延期执行所造成的成本增加。
第十七条合同终止
1.按照第_________第规定,如果暂停时间持续超过_________天,任何一方都有权通知另一方立即终止本合同。
2.业主可以随时书面命令承包商停工,承包商在收到终止命令后应停止工地上所有的工作,但工程师出于保护、安全目的,或整理已建的或正在安装的工程,这类工作仍可继续。承包商在收到终止命令后,也应立即停止所有正在工地外进行的履行合同的工作。
3.根据本条款和第_________条规定,合同终止后,承包商有权收取下列费用:
a.与所完成的工程和劳务相应的那部分合同价格;
b.与已完成但未移交的工厂相应的那部分合同价格。
第十八条不可抗力
1.如果任何一方因不可抗力而款能履行或推迟履行其义务,则不对另一方负责,也不应视作违反合同。
2.“不可抗力”指业主或承包商无法控制的情况,使当事人未能按本合同履行其义务,或者不得不延迟履行其义务。下列情况均被视作“不可抗力”:
a.战争、敌对事件、外敌行动、入侵、类似战争的军事行动(不管是事宣战)、内战;
b.士兵哗变、民众_____、军事_____、起义、造反、_____、篡权、或者任何个人代表某个组织或与某个组织有联系、旨在以暴力推翻合法或现存政府、或以_____或暴力对政府施加影响的行为;
c.地震、洪水、火灾或其他自然灾害;
d.所有港口、机场、船运或其他公共交通工具的使用均遭拒绝;
e.工人_____、工厂停工、或其他的劳工联合行动,影响了承包商和分包商履行其义务;
f.当事人无法控制、从而使其不能履行义务的其他任何意外情况。
3.如果本合同任何一方因不可抗力不能或延迟履行本合同规定的任何义务,他可将不可抗力和由此造成的延迟或妨碍情况通知另一方。发出通知的一方允许根据具体情况及妨碍或延迟持续的时间免于履行或推迟履行合同。
4.根据本第款第3分条规定,如果任何一方免于履行或推迟履行其义务的时间持续了_________个月,那么任何一方都可随时向另一方发出书面通知,终止本合同。
第十九条转让及分包
1.承包商有权按其惯例分包本合同或本合同的任何部分,而不解除承包商履行本合同的任何义务。
2.事先未经另一方书面同意,任何一方都不得将本合同或其中的权利、义务,或合同的任何部分转让或让与第三方,除非公司合并或改组。如出现此种情况,任何一方都不应毫无理由地予以拒绝。
第二十条宣传
承包商在作与本合同相关的宣传材料的散发或公开宣布前,应征得业主的同意。
第二十一条合同生效日
1.本合同生效日为双方签字后,业主获得当事人双方各自有关当局的所有必要批文之日。
2.如果本合同自签字之日起_________天内仍不能生效,合同即被视作无效,除非双方另有商定。
第二十二条法律和规定
1.承包商应在与履行本合同有关的所有事务中遵守所有适用的法律、法规和命令。
2.本合同的解释、效力和履行,应完全以_________国的法律为准。
第二十三条完整合同
1.本合同是与约双方之间的完整协议,它取代了以前所有与本合同事项有关的洽谈、说明及口头或书面协议。
2.对本合同的任何修改或补充,须经业主和承包商双方的书面同意。
第二十四条合同语言
本合同以中文和英语起草,并以英文本为准,对方双均有约束力。
第二十五条通知
1.按本合同发出的每个通知、同意、指示、命令或决定,应以书面形式发送。发送方式有:向对方有关官员当面递交,或预付邮资航空传递,或通过电报、电传,或先发电报后信件确认。通讯地址如下:
业主:_________________________________;
承包商:_______________________________。
2.如果通知、同意、请求和其他文件发往某个海外目的地,在邮寄日后第_________天应视作已经送交;如果发往国内目的地,在邮寄日后第_________天视作已经送交。用电报、电传发出的通知、同意或请求应视作当天送达。
3.按本条款发送的所有通知、同意、批示或决定,应由有关方授权的代表签字。任何一方任何时候如欲变动收件地址,应以书面形式通知对方。
承包商(盖章):________________业主(盖章):_________________
代表人(签字):________________代表人(签字):_______________
________年________月________日________年________月________日
签订地点:______________________签订地点:_____________________
建造合同 篇18
长春图书馆分馆是长春图书馆在馆外设立的读者服务场所,在业务上接受长春图书馆的指导与检查,在行政上隶属其主管部门。为确保分馆工作的可持续发展,明确长春图书馆与分馆各自应承担的责任、权利及义务,经双方共同协商,达成如下协议:
一、长春图书馆的责任、权利及义务:
1、负责对分馆进行业务指导及人员培训;
2、负责技术支持,包括:计算机管理软件的选择、安装、技术指导、维护等;
3、首次提供图书500册;提供较新期刊1000册;
4、定期为分馆流通图书、期刊;
5、不定期为分馆提供文化信息共享工程的刻录光盘等资源。
二、分馆的责任、权利及义务:
1、提供一处面积不低于40平方米的馆舍;
2、保证年购书经费在20xx元以上或筹集有利用价值的书刊200册以上;
3、设专职或兼职工作人员,并保证工作人员的相对稳定;分馆工作人员调离时,应在有关人员的监督下清点藏书,办理交接手续;
4、分馆需与长春图书馆办理集体借书手续,每次可借200—500册书刊;
5、每年开馆时间不少于100天,每年发展读者不少于100人;
6、每年组织读者活动不少于2次。
7、书架(单面6层,每个书架可放置图书400册)需5个以上;期刊架(单面6层,每个期刊架可放置期刊24种)需2个以上,并配备相应的报纸架、阅览桌椅等专用设备;
8、在有条件的情况下配置计算机,并通过网络与长春图书馆实现资源共享;
9、做好各项业务统计工作,并及时上报长春图书馆,确保统计内容的准确性和完整性;
三、双方应严格遵守本协议,如一方未能遵守,另一方有权要求解除
四、协议有效期为一年,有效期满,双方对协议无异议,可自动延长
五、协议解除之后,分馆需返还长春图书馆为其配置的相关设备及文献。损坏或丢失设备需按原价进行赔偿;丢失、损坏长春图书馆的书刊需按长春图书馆的有关规定进行赔偿;
六、本协议未列事项,双方本着平等互利的原则协商解决
本协议一式两份,双方各执一份,协议自签字之日起生效。
长春图书馆 分馆
公章公章
签字:签字:
建造合同 篇19
立契约书人委建人x x x(以下简称甲方)与建方 x(以下简称乙方),本契约不动产标示委建事项经由甲乙双方同意订立条款如下,以资共同遵守:
第一条 房地标示:本契约房屋坐落在x x 市x x区地号土地内定名
第二条 房屋面积 :本契约房屋面积包括室内、阳台及走道、楼梯间、屋顶突物(仅限于水箱及楼梯间,其余部分不计入)地下室、电梯间等公共设施分摊面积在内计约x x平方米,(实际面积以当地政府机关复丈后,建筑改良物所有权状所记载的面积为准),但双方同意建筑改良物所有权状记载面积加上本条前列(阳台走道、楼梯间等)公共设施分摊面积等,即相当于本契约所记载面积,若有增减,而其面积差额未逾百分之二时,双方均不得异议,若增减面积误差超过百分之二时,其误差超过百分二部分,即以该户出售时的平均单价为计算基准,由双方互为补偿。
第三条 本大楼的屋顶除水箱、楼梯间外,乙方的投资、规划,其使用权归乙方,但乙方应对甲方提供较一般人优惠的服务。
第四条 本大楼地下室产权登记为本大楼全体所有人共有,地下室除机电设备外,其余场地如遇空袭时,应开放为公共避难场所,地下室平时作为停车场,由本大楼管理委员会统筹管理,其办法另详载于本大楼管理委员会管理章程。
第五条 甲方所订购房屋的室内隔间装饰及设备工程,其施工标准悉依x x市政府x x局核准的建造执照图说按图施工,如甲方要求变更或增减等,须征求乙方同意,惟属大楼整体装置者不得删减,变更后的工程款由双方协议定之,但以不少于本契约所定的工程款一次付清与乙方,甲方未缴清增加的工程款前,乙方不得施工,如双方对变更后工程款未能达成协议或甲方拒绝或延迟交付所增加变更的工程款时,视为甲方取消变更或增减,乙方仍按本契约原定项目施工。
第六条 工程期限:本契约房屋建筑工程,乙方应于本契约签订后三个月内开工,自开工之日起七百个工作天完工,并以开始申请使用执照为完工日期。但如有下列情形之一时不在此限,乙方不负迟延完工之责。
(一) 甲方未依约定付款办法的规定交付价款时。
(二) 甲方要求变更内部隔间与设计,致迟延完工时。
(三) 因不可抗力的原因如天灾人祸或法律法规限制等不可归责于乙方的事由,以致工程不能如期进行时。
(四) 本工程屋外排水沟及巷道铺设工程,不受本条约完工时限的拘束,水电等的接通供应悉凭该公用事业作业程序而决定。
第七条 保固期限:本契约房屋自领到使用执照之日起,对本契约房屋建筑结构,乙方应负责保固一年,但天灾或不可归责于乙方的原因而发生损毁者不在此限(门、窗、玻璃及水电配件、油漆、瓷砖等乙方不负责保固)。
第八条 甲方订购本房地总价款为人民币x仟x佰x拾x万x仟整,包括下列房屋及装修土地价款。
(一) 房屋及装修价款为人民币x佰x拾x万x仟整。
(二) 土地价款为人民币x佰x拾x万x仟元整,包括建筑基地,道路用地及地上物补偿金、土地改良费、公共设施用地等费用。
第九条 付款办法:本契约房地总价为人民币x仟x佰x拾x仟元整,分为自备款人民币x佰x拾x万x仟元整,优惠贷款人民币x佰x拾x万x仟元整,银行贷款人民币x佰x拾x万x仟元整,甲方应按下列进度,将分期付款表上的金额,经乙方通知于缴款期限内缴付乙方,绝不拖延短欠。
第十条 贷款办法:本契约房屋甲方如须办理银行贷款时,应另行与乙方签订委托代办贷款契约书及委任书以凭办理贷款事宜。
第十一条 甲方如全部或一部分不履行本契约(第九条)所规定工程进度的约定付款时,其逾期部分甲方愿自通知交款日后第五天起,按日加付千分之一计算滞纳金,上项滞纳金于补交其应付款时一并付与乙方,如逾期滞纳达十五天,经乙方催告仍延不交付时,即视为甲方违约,乙方不得解除本契约及代办贷款委托书,代管印章委托书等与本契约有连带关系的约定,甲方同意将已缴的款项现金部分由乙方没收,以为抵偿乙方所受的损失,乙方并得将甲方所订购的房地另行出售与第三者或为其他处分,甲方绝无异议,甲方若依前条约定的付款规定,以票据支付时,甲方保证兑现,如有遭退票情形等,视为甲方未缴款,依前述约定方式处理。
第十二条 本约房屋如乙方非因第五条的情形而逾期交屋时,其每逾一日按买卖总价千分之一计算违约金与甲方,如乙方因本身因素不履行交屋,及半途发生纠葛不能出卖等情况时,除应将既收价款全数退还甲方外,并应赔偿所付价款同额的损害金予甲方作为乙方不履行本契约的损害赔偿总额。倘因政府颁布禁建等不可归责于乙方的事由,致使乙方不能交付本契约房屋时,双方同意解除本契约,乙方应将甲方所缴付价款加计利息(按照银行一年期定期存款利息计算)退还甲方。
第十三条 本契约房屋已登记于甲方名义,如甲方违约拒付款项,经乙方催告仍不交付时,甲方同意名义变更为乙方或乙方所指定之人,甲方不得另有其他的要求。
第十四条 甲方负责订购本房屋土地,其房屋产权及基地产权的移转登记事项,乙方负责于本房屋建造完成,经政府主管单位发给使用执照,及甲方依约履行其义务后,乙方负责聘请代书与甲方共同委托统筹办理,甲方应按照乙方通知的时间内,将应提出的证件及在有关文件上盖章,连同各项税捐交与乙方或委托的代书以资办理。甲、乙双方应负担的费用如下:
(一) 建筑物登记费、土地登记费、印花税、契税、监证费(或公证费用)各项规费及代办产权登记费用由甲方负担。
(二) 本契约土地移转过户前的土地价款及移转过户时发生的增值税由乙方负担。
(三) 本契约房地移转登记及质押贷款的抵押权设定登记移转规费,公定契纸、印花税、保险费及代办手续费均由甲方负担。
(四) 自领到使用执照之日起所发生的房屋税、地价税、工程受益费不论甲方已否迁入或抬头为任何一方,均由甲方负担如数缴清不得异议。
(五) 以上各项应由甲方负担的费用,如由乙方先行垫付或代缴,甲方应如数归还需要。
第十五条 产权登记:本契约房地产权登记由乙方指定代理人,统一办理土地移转登记,建物所有权登记及贷款抵押权设定登记等手续。
第十六条 本契约房地,乙方保证产权清楚,绝无任何纠纷或设定他项权利现象,如有任何纠葛,乙方应负责清理,不得损害甲方的利益。
第十七条 甲方同意于本房屋完工并接通水电之日起,无论所开列单据的抬头为任何一方,均就负担下列费用:
(一) 本户水电基本费用。
(二) 本房屋自领得使用执照日起的房屋税。
(三) 属于本房屋公共使用应由全体住户分担的水电费用。
(四) 属于本建筑清洁保持、公共设施及设备的整理、操作与维护等事项,应由全体住户分担的管理费用。
(五) 本房屋有关公共管理费用的分担。
第十八条 本契约房屋于建筑完成经主管机关发给使用执照后,甲方应付清下列款项税费等,乙方始行交屋,甲方如不协办或迟延逾期的,致影响本契约各项产权登记或施工进度时视同违约,并应负赔偿乙方一切损失之责。
(一) 缴付本约第十四条第一、三、四项约定应付的税捐。
(二) 办妥产权登记及代办贷款等费用,并预付乙方四个月的利息。
(三) 付清因逾期付款的滞纳金。
(四) 付清本房屋的所有优惠贷款。
第十九条 通知送达:甲乙双方所为的征询、洽商或通知办理事项均以书面按本约所载住址挂号邮寄为之,有拒收或无法投递致退回的,均以邮局第一次投递之日期为送达之日。
甲方的住址如有变更时,负有通知乙方的义务。
第二十条 其他事项。
(一) 如甲方半途要求在本契约房屋变更设计,须以书面征得乙方同意后委托乙方办理,所需工程费用经双方议定价格后,差价由甲方于变更同时给付乙方,但经不减少于原定总价为原则,如甲方未在约定期间内给付时,乙方即视为甲方已取消变更设计的要求,乙方为避免影响工程的进度,得按原合约图说施工 ,甲方绝无异议。
(二) 乙方通知交屋并给迁入证明前,甲方绝不进行本约房屋自行装潢施工。
(三) 本契约书于付清所定价款办妥交屋手续、土地移转登记完毕甲方领取所有权同时,本契约书及本约有连带关系的契约、附件,甲方得一并由乙方收回作废。
第二十一条 本契约的约束与效力:
(一) 甲方未付清房地价款及未取得乙方同意前不得将本契约房地的权利与义务自行转让他人,但经双方同意后,本契约所约定事项对甲乙双方权利与义务的受让人合法继承人具有同等约束力。
(二) 本契约附件视为本契约的一部分,与本契约具有同等效力,依据本契约的规定 。
第二十二条 未尽事宜:本契约如有未尽事宜,必要时由甲乙双方洽定。
第二十三条 契约分存:上述契约事项经双方同意,恐口头无凭。特立本契约书一式二份,甲乙双方各执一份为凭,并自签订日起升效,印花税由甲乙双方自贴销。
第二十四条 有关本契约的权义,双方同意以x x x法院为管辖法院。
立契约书人:
甲方:
法定代理人:
住址:
身份证号码:
电话:
乙方:
住址 :
身份证号码:
电话:
x x x x年x月x日
建造合同 篇20
委托方:(以下简称甲方)
施工方:(以下简称乙方)
经甲、乙双方共同协商,甲方同意以包工包料(大包干)的形式委托乙方设计并施工建造钢质1800吨级自航自卸机动驳船壹艘,双方本着友好协商,平等互利互惠的原则,就自航自卸船建造施工的具体有关事宜特签订如下协议,以便双方共同遵守执行。
一、船舶的主要尺寸及技术要求:
船体总长70.8m,船体型宽12.8m(均不包括护舷材长度、宽度),船体型深3.0m,船舶建造质量及主要材料产地、规格、型号、各种机械及电气设备的产地、规格、型号、技术要求严格按照国家有关船舶建造设计及施工规范和用户要求施工。
二、建造工期:
从合同签订之日起总工期为210天,即从20xx年12月3日至20xx年7月3日止全部竣工验收交船。每提前一天交船由甲方奖励乙方人民币200元,每推后一天交船由乙方赔偿甲方人民币200元。
三、船舶总造价:
经甲乙双方协商,船舶总造价贰佰柒拾玖万玖仟玖佰玖拾玖元整(小写¥2,799,999元)大包干。不论市场材料价格变化、材料品种及规格短缺等原因的影响,而上述船舶的总造价不变,甲方不承担任何费用。
四、施工质量及技术要求:
1、乙方应按国家有关船舶建造施工及验收规范的要求施工、验收,实行质量三包。主要材料及机械设备、电气设备等所需用的型号、品牌、规格、质量的具体要求请按合同附本的内容执行,合同附本内没有明确的部分按有关规范要求执行。交船后6个月内实行免费维修,如属施工质量问题影响所造成的一切经济损失由乙方负责。
2、油漆质量要求:船体底板、外围身板、货舱内流水槽板全部刷上海生产的(光明牌)830—1型船舶专用铝粉沥青船底防锈漆两遍,刷931型(光明牌)黑棕沥青船底防腐漆两遍,甲板和船舱内、货斗走道、二层甲板、顶甲板采用湖南造漆厂生产的湘江牌油漆,红丹防锈漆壹遍,铁红面漆壹遍,围壁及舾装部位刷红丹防锈漆壹遍,中绿面漆两遍,机舱与驾驶室刷红丹面防锈漆壹遍,天兰面漆两遍,餐厅、厕所、厨房、住宿区刷红丹防锈漆壹遍,驾驶室前围板刷红丹防锈漆壹遍、白色面漆两遍,甲板延边及木门刷橘黄油漆两遍。
五、船体制作质量要求:
船体外部焊接部位必须剖口,焊接必须牢固,船体焊接需按规定做油浸试验。船体制作时不得出现凹凸现象,板面必须平直,弧面必须平直,弧面要求圆滑,全船所有加强连接板,厚度不能低于6mm,桁架角钢必须到位,舾装部位板面连接要求采用折边连接,外平面采用间接焊接,内平面折边外满焊,系缆桩系底板不能低于10mm,底座6mm,底板舱内要求加固。锚机底板不能低于10mm,锚机底板舱内加固、加立柱到实肋板,货斗走道板面连接处要求双面满焊,焊条全部采用株洲生产的湘江牌电焊条。
六、装修质量要求:
基础木方需平直,安装时要求紧固,吊顶要求平直、顶面和墙面采用胡桃板做面板,五厘板做衬板,底衬板必须用圆钉与木方连接,面板与底衬板必须先胶接后用气钉。板面用小木方制成田字结构,最后用清漆涂刷两遍。
七、安全文明施工:
在船舶建造施工过程中,乙方应严格按国家有关安全文明施工操作规程施工,严禁违章作业,机操人员、特种行业施工人员要持证上岗,因违章作业及操作不慎所造成的一切大小安全事故一概由乙方负责,甲方不负任何责任。
八、船舶出厂检验:
乙方在应船舶未出厂前按规定向船检机关申报船检,经船检部门验收合格后发放航行证书,并交齐船舶出厂检验的各项费用,甲方不再承担任何费用。
九、试航、试车
由甲方在试车前七天派驾驶、轮机人员准备试车试航工作。
试车、试航所用润滑油、柴油由甲方提供。
十、付款方式
船舶全部竣工验收交船后(除2万元质保金在船舶运行6个月后支付)一次性付清。
十一、违约责任:
在船舶建造施工过程中如属乙方不按国家有关规范、设计图纸、合同规定及合同附本的要求施工,单方作主、私自修改船舶结构、尺寸,修改材料及设备型号、品牌、规格或者以各种借口停工而影响施工质量或工期所造成的一切经济损失由乙方负责。甲方将根据《中华人民共和国合同法》向人民法庭提出诉讼,如甲方资金不按合同工期支付,乙方享有同等权利向甲方索赔。
十二、本合同一式肆份,甲乙双方各执两份,双方签字后生效,并由各自承担法律责任,需双方共同遵守执行。
甲方签字:
日期:
乙方签字:
建造合同 篇21
【判断题】
“工程施工”科目余额小于“工程结算”科目余额,反映施工企业建造合同未完工部分已办理了结算的价款总额,在资产负债表上列作一项流动负债,通过在资产负债表“预收款项”项目反映。( )
(对 、错)
正确答案: 对
【判断题】
如果建造合同的预计总成本超过合同总收入,则形成合同预计损失,应提取损失准备,确认为当期费用,该损失准备一经计提,在建造工程期间不得转回。( )
(对 、错)
正确答案: 对
答案解析 :
预计损失不能转回,只能在完工时,将该损失准备转销冲减合同费用。
相关知识点:
建造合同成本包括从合同签订开始至合同完成止所发生的、与执行合同有关的直接费用和间接费用。
直接费用是指为完成合同所发生的、可以直接计入合同成本核算对象的各项费用支出。直接费用包括四项费用:耗用的人工费用、耗用的材料费用、耗用的机械使用费和其他直接费用(指直接可计入合同成本的费用)。
间接费用是企业下属的施工单位或生产单位为组织生产和管理施工生产活动所发生的费用,包括临时设施摊销费用和施工、生产单位管理人员工资、奖金、职工福利费、劳动保护费、固定资产折旧费及修理费、物料消耗、低值易耗品摊销、取暖费、水电费、办公费、差旅费、财产保险费、工程保修费、排污费等。
直接费用在发生时直接计入合同成本;间接费用应在期末按系统、合理的方法分摊计入合同成本。常见的用于间接费用分摊的方法有人工费用比例法和直接费用比例法。
合同完成后处置残余物资取得的收益等与合同有关的零星收益,应当冲减合同成本。
合同成本不包括应当计入当期损益的管理费用、销售费用和财务费用。因订立合同而发生的有关费用,应当直接计入当期损益。
建造合同 篇22
YACHT BUILD AGREEMENT
DATED: 22nd December 20__
between
AAA‘s Yacht Company Limited, Hong Kong. (Hereinafter referred to as “the Builder”)
and
BBB CC, Vietnam, (Hereinafter referred to as “the Buyer”)
WHEREAS:
1) The Buyer wishes to acquire a AAA‘s Cape 65 Trawler Yacht (the yacht) designed by Thanos Condylis, and built to the Buyer’s stated requirements and specification, and the Builder has the capability, knowledge and skills to build and supply the same.
2) The Builder has agreed to construct, equip, fit-out, test and deliver the Yacht to the Buyer‘s stated requirements and specification, which the Buyer has agreed to accept upon the terms and conditions here in after specified:
Now therefore the Parties hereto have agreed and do hereby agree as follows:
ARTICLE I - INTERPRETATION
1) In this Contract the following words and expressions shall have the meaning hereby ascribed to them, except where the context otherwise admits or requires:
“Banking Days” Shall mean days upon which Hong Kong clearing banks are customarily open for business.
“the Builder‘s Clarifications” Shall mean the documents so entitled forming part of this Contract and set out as Annexes hereto; (See also Item (2) of this Article.)
“Buyer‘s Representative(s)” Shall mean such persons notified from time to time by the Buyer as having authority to act for the Buyer, the extent of such authority being set out in the notice;
“Items of Buyer‘s supply” Shall mean any item of equipment and stores for the Yacht ordered by the Buyer direct from the manufacturer or the supplier, for incorporation in the Yacht by the Builder;
“Items of Builder‘s supply” Shall mean any item of equipment and stores for the Yacht ordered by the Builder direct from the manufacturer or the supplier, for incorporation in the Yacht;
“the Certifying / Survey Body” Shall mean the body responsible for the survey and certification of the yacht to the requirements of the buyer.
“the Contract” Shall mean (a) this Contract, and (b) the attached Annexes and schedule more particularly described below.
“the Contract Delivery Date” Shall mean no later than 30 June 20__;
“the Contract Master Programme” Shall mean the programme for construction of the Yacht, set out in Annex D;
“the Contract Price” Shall mean the price stipulated in Article V for the Yacht, Yard Number 005;
“the Yacht” Shall mean the yacht the subject of this Contract and generally as described in Article II, with all the machinery, apparatus, outfit, materials, and equipment appurtenant thereto, but excluding the items of Buyer‘s supply.
“the Boatyard” Shall mean AAA‘s Yacht Company, Xinhui, China.
“the Design Specifications” Shall mean the specifications, designs, plans and drawings, set out in Schedule A, prepared and signed by the Buyer, identified as forming part of this Contract, and including such revised or supplemental specifications, plans and drawings as may subsequently be agreed between the Buyer and the Builder PROVIDED that (i) in the case of any inconsistency between any Article or paragraph of this Contract and the Design Specifications, this Contract shall prevail, (ii) in the case of any inconsistency between the Design Specifications and a plan or drawing, the Design Specification shall prevail, and (iii) in the case of any inconsistency between one plan or drawing and another plan or drawing, the later in date shall prevail;
\"Schedule A\" Shall mean the agreed schedule of drawings
“Annex A” Shall mean the list of materials, components and equipment defining a completed yacht;
\"Annex B\" Shall mean the agreed weld quality procedures
“Annex C” Shall mean the agreed Shot Blasting, Fairing, Painting and foaming Specifications
\"Annex D“ Shall mean the agreed production schedule master program.
“Specified” Shall mean stipulated in the specifications and Annex A;
“Supplier” Shall mean any person, firm or company, which has entered into a contract with the Builder for the supply of materials, machinery, services or equipment (other than items of Buyer‘s supply) for the yacht;
The Index, Article and paragraph headings, are inserted for convenience only and shall not affect the construction of this Contract.
Words importing the singular shall include the plural and vice versa.
2) List of Builder‘s clarifications, not covered in Annex A document:
“Cradles for Transport” The supply of a Cradle for shipment is excluded from this Contract.
“Dressing/Stepping the Mast” The dressing and stepping of mast for the Yacht is included in the Builder‘s supply.
“Storage” The Builder will arrange secure storage ashore for the Yacht at the Boatyard between completion of build and handover at delivery.
建造合同 篇23
本合同由_____________________(船东单位全称)(以下简称甲方)和_____________________(承造船厂全称)(以下简称乙方)就建造______________(船舶名称)(以下简称本船)_______艘,于 _______年_____月_____日在_________省_______市签订。
第一条 工程内容、建造数量及依据
1.1 工程内容
1.2 建造数量:_____艘
1.3 建造依据
本船由甲方委托______进行设计,技术设计经送CCS审查认可,由______负责施工设计。
下列文件作为本船建造依据,并成为本合同不可分割的组成部分:
(1)技术规格书 (图号:__________________)
(2)全船说明书 (图号:__________________)
(3)船体结构说明书 (图号:__________________)
(4)舾装说明书 (图号:__________________)
(5)轮机说明书 (图号:__________________)
(6)空调说明书 (图号:__________________)
(7)机械说明书 (图号:__________________)
(8)电气说明书 (图号:__________________)
(9)总布置图 (图号:__________________)
(10)舯横剖面图 (图号:__________________)
(11)机舱布置图 (图号:__________________)
(12)轮机国内设备订货明细表 (图号:__________________)
(13)轮机进口设备订货明细表 (图号:__________________)
(14)电气国内设备订货明细表 (图号:__________________)
(15)电气进口设备订货明细表 (图号:__________________)
(16)甲板机械订货明细表 (图号:__________________)
(17)舱室设备订货明细表 (图号:__________________)
(18)主要舾装设备订货明细表 (图号:__________________)
(19)工程机械设备订货明细表 (图号:__________________)
注:
①凡造价在500万元以上的船舶应给出上述可能的全部图号,500万元以下的船舶应给出(1)、(2)、(5)、(8)、(9)、(11)和主要订货明细表图号;
②有与本合同不可分割的附件应列入此款中,如:本船供图协议、由设计单位提供的并经甲、乙双方共同认可的厂商表、由甲方委托乙方办理的进口设备的明细表以及有关文件的文号等;
③如图纸与全船说明书不一致时,以全船说明书为准;
④如全船说明书与本合同不一致时,则以本合同为准。
1.4 工程编号(指工厂的生产工程编号)
乙方必须以自己的设备、技术和劳力,完成本船的建造工作,未经甲方同意,不得把承造的船舶转让给第三方,包括乙方自办的第三产业。
1.5 乙方承担甲方提出的有关技术方面的保密义务。
第二条 概述与船级
2.1 概述
2.1.1 用途
2.1.2 船型
2.1.3 航区
2.1.4 船舶主尺度
总长____________(m)
垂线间长____________(m)
型宽 ____________(m)
型深 ____________(m)
设计吃水____________(m)
2.1.5 船舶主要工程技术指标
(1)系柱拖力:最大系柱拖力为______KN。专指拖船
(2)吊重:(给出何种限制条件下的起吊重量)专指起重船
(3)挖深及其他工程作业指标:(给出何种限制条件下的挖深及其工程指标要求)专指挖泥船
2.1.6 动力装置
主机生产厂 主机型号 主机台数
最大持续功率(KW) 转速
齿轮箱生产厂及型号 速比
发电机组:原动机型号 功率(KW ) 转速 台数
发电机型号 功率(KW ) 生产厂
2.1.7 航速、主机燃油消耗率和自持力
(1)试航速度:
船舶在试航压载状态,吃水______米,船体无污底,风力小于蒲氏风力3级,深静水,主力功率为______KW,航速不小于______公里(或节)。
(2)主机燃油消耗率
主机在其制造厂车间台架上试验,在ISO标准工况下,其合同最大持续功率(KW)_____,转速为_____转/分,燃油消耗率为______克/千瓦小时+3%。
(3)自持力:
本船主机在常用功率(85%MCR),油水舱柜装满,续航力不小于______公里(或海里),自持力不小于______天。
2.1.7 建造工艺
本船建造工艺按乙方的造船工艺和惯例进行。
2.2 船级和规范
2.2.1 本船的建造、入级,应满足本船建造合同签字之日已公布实施的、必须满足本船说明书中规定的规范、规则及有关国际公约的规定。由中国船级社代表中国政府对船舶进行法定和船级检验,按中国船级社的规范和规则进行设计、建造和检验,并取得下列船级符号:
2.2.2 本船交船时,应取得中国船级社的证书。申请船舶建造检验和入级由乙方办理,费用包括在合同价格内,由乙方支付。
第三条 材料和设备
3.1 本船所需的材料和设备(包括进口的),除按本船说明书或另有协议应由甲方供应外,均按本合同的第一条第三款双方认定的厂商表,由乙方负责订购。甲方有权参加双方商定的船舶主要设备的验收及厂商表中规定的主要设备、材料的技术谈判。
3.2 按照规定,由乙方供应的从国外进口的设备、材料和税金等,均已列入本合同价内,由乙方支付。进口设备开箱时,乙方应通知甲方驻厂代表参加。
3.3 乙方对甲方提供的设备、仪器和材料,应及时检验,发现不符合合同规定时,应立即通知甲方调换或者补充。
3.4 乙方隐瞒原材料与设备的缺陷或者使用不符合合同规定的原材料与设备而影响船舶质量时,甲方有权要求更换、修理和减少船价。
3.5 乙方对甲方提供的设备、仪器和材料必须按要求妥善保管。由于保管不善,致使甲方提供的设备、仪器和材料损坏的,乙方应负责赔偿。
3.6 乙方由于原材料、设备、备品、供应品订货困难等原因影响建造进度时,征得甲方或甲方驻厂首席代表同意后,可采用符合船检要求的代用品。凡涉及船舶性能及验船规范的,还应征得船检部门的同意。
3.7 机电设备及辅助机械系统的备品、备件、工具,文件及说明书,乙方应按规范要求和制造厂的标准随机备件清单(或按双方议定的清单)在交船时交给甲方。如有欠交部分,应征得甲方同意,在双方议定的日期补交或作减帐处理。上述清单应编入完工资料中。
第四条 合同价格及付款方法
4.1 合同价格
4.1.1 本船合同价格以人民币(RMB)____________为货币单位计价、结算及支付。
4.1.2 本船每艘的合同价格为人民币(RMB)____________万元整(¥____________)
4.1.3 上述合同价格包括甲方委托乙方办理的进口设备和材料的费用,暂按______万美元计,汇率暂按______元人民币/美元,折算人民币__________(大写与小写)元整,进口部分价格按对外商务合同和实际支付日汇率进行调整。
4.1.4 上述合同价格包括施工设计、船检审图等费用,包括由甲方支配的监造费、接船费及该船的技术评估费___________万元整(¥______)。
4.1.5 上述合同的价格包括进口设备的关税、增值税,手续费、监管费等,总计为进口设备的______%。
4.1.6 本合同在执行过程中,因甲方提出正式书面意见发生的项目变更或修改而引起的加减帐工程费用,在交船时同本条款4.2款规定的最后一期付款一起结算。
4.1.7 上述价格为无条件的最终封闭价。
4.2 国内部分付款方法
4.2.1 乙方应在船舶建造前将该船的建造计划书面通知甲方,除第一期款外,其余各期付款应在一个月前书面通知当期的进度付款要求,以使甲方及时准备款额。
4.2.2 第一期付款
(1)合同经甲方上级主管机关批准后,甲方即向乙方支付合同价格的百分之二十(20%)中的50%的款额,即人民币____________万元整(¥______)。以电汇发出的日期为____________(下同)。
(2)合同生效后30个工作日内,甲方即向乙方支付合同价格的百分之二十(20%)中的50%的款额即人民币________________万元整(¥______)。
4.2.3 第二期付款
甲方在收到经甲方驻厂首席代表签认的本船开工报告及付款通知单后7个工作日内(以邮局邮戳日期为准,下同),向乙方支付合同价格的百分之二十(20%)的款额,即人民币____________万元整(¥____________)。最迟不超过十五(15)个工作日(下同)。
4.2.4 第三期付款
甲方在收到经甲方驻厂首席代表签认的本船大合拢报告及付款通知单后7个工作日内,向乙方支付合同价格的百分之二十五(25%)的款额,即人民币____________万元整(¥____________)。
4.2.5 第四期付款
甲方在收到经甲方驻厂首席代表签认的本船下水报告及付款通知单后7个工作日内,向乙方支付合同价格的百分之二十五(25%)的款额,即人民币____________万元整(¥____________)。
4.2.6 第五期付款
在甲、乙双方签订《交接船议定书》后十五(15)个工作日内,甲方即向乙方支付合同价格的百分之十(10%)的款额即人民币____________万元整(¥____________),并与按本合同有关条款的规定经双方认可的加减帐、赔偿金、罚金等项目一起结算。
乙方同意甲方暂留船价的______% 万元人民币作为质量保证金,如在质量保证期内本船未发生质量问题,则保证期满后由甲方退还乙方。
4.3 进口部分付款要求
4.3.1 进口设备的对外商务合同生效后15个工作日内,甲方即向乙方支付该商务合同价格的______%款额。
4.3.2 根据乙方书面通知,在开具进口设备信用证前至少45天内,甲方即向乙方支付本合同价格的______%款额。
4.3.3 以上是常规付款约定,如进口设备商务合同的付款要求有变化,则甲乙双方可另签补充协议,并以补充协议为准。
4.4 逾期补偿
如甲方未按本条款规定的日期付款,则甲方除付清价款以外,还应支付合同规定付款日的次日算起一直到向乙方实际付款日止应付金额的利息和违约金,利息以同期建设银行规定的流动资金贷款发生利率计算。乙方不能因此影响船舶的正常日期。
第五条 合同价格的调整
5.1 交船期
5.1.1 本船交船日期不超过本合同第九条第9.1.1款规定的交船日期(有与本合同不可分割的补充协议“允许的延误”除外,下同)的当天午夜12时,本船的合同价格不作调整(如有加减帐除外)。
5.1.2 本船从超过本合同第九条第9.1.1款规定的交船日期,即______年______月______日午夜12时起,每天从本船合同价中扣除______%,计人民币 元整(¥____________),并以120天为限。如在合同规定的交船期后的120天尚不能交船,甲方有权拒收该船,或另行商定交船日期并减少船价。如甲方拒绝接船,则乙方除退还甲方全部已付本金(含由甲方提供的材料和设备的价款)和同期建设银行规定的流动资金贷款利率的利息外,还应赔偿由此给甲方造成的经济损失。
5.1.3 如果甲方要求提前交船并与乙方达成协议,则甲方应付给乙方赶工费,从本合同第九条第9.1.1款规定的本船交船日期前当天午夜12时开始,每提前一天,在本船合同价的基础上增加赶工费人民币 元整(¥____________)。
5.1.4 本船在建造中,如甲方提出要求乙方延期开船,超过本合同第九条第9.1.1款规定的本船交船日期后十五(15)天时,必须征得乙方同意,并双方签订修改交船日期、赔偿金等协议,该协议为本合同不可分割的组成部分。
5.2 航速
如有因建造厂施工方面的原因而引起的实际试航航速未达到设计要求,如航速低于设计航速零点三至零点五(0.3-0.5)节(不含零点三节),则应扣除本船合同价的千分之五(5‰);如航速低于设计航速零点五至零点七(0.5-0.7)节,则应扣除本船合同价的百分之一(1%);如航速低于设计航速零点八(0.8)节以上,甲方有权拒绝接船或降价接船,如甲方拒绝接船,则乙方除退还甲方全部已付本金(含由甲方提供的材料和设备的价款)和同期建设银行规定的流动资金贷款利率的利息外,还应赔偿由此给甲方造成的经济损失。
5.3 其它应要求的技术保证指标和违约责任(如拖船系柱拖力、工程作业的起吊重量、挖泥船的挖深、排距指标等)。
第六条 监造
6.1 图纸审查和认可
6.1.1 施工设计图纸审查按双方议定的审查目录,由乙方一式二套,分期分批送甲方审查认可。甲方在收到图纸后20天内,以书面形式提出审查意见,并将一套标注审查意见的图纸退回乙方。如甲方到时未提出意见,则表示甲方已对原图认可,乙方对甲方的书面意见应在7天内予以书面答复。如乙方未按时答复,则认为乙方已接受甲方所提的意见。如果图纸和信函邮寄,则收退图纸和信函日期以邮戳日期为准。
6.1.2 乙方应分别给甲方和甲方驻厂代表提供二套施工图纸,同时,把建造过程中由乙方发出的“修改通知单”送甲方驻厂代表一份。
6.2 甲方代表
6.2.1 甲方代表在船舶进度达到(接船厂书面通知)时进厂监造,甲方应确定首席代表。
6.2.2 为甲方代表工作方便,乙方应免费提供甲方驻厂代表的通讯、办公室、办公设备用品和劳动保护用品,并给予住宿、伙食及交通的方便(其费用由甲方自理)。
6.2.3 为使甲方代表检验方便,乙方应为甲方及时提供施工建造进度报告。
6.3 甲方代表的权力
6.3.1 甲方代表有权进入本厂与本船建造有关的各工作场所。
6.3.2 如果甲方代表需到各设备协作厂进行检查验收,乙方应疏通渠道,但交通等费用由甲方自理。
6.3.3 本船在整个建造期间规定的一般验收和试验项目,由乙方提前一个工作日书面通知甲方代表参加试验和检查项目的时间和地点,甲方代表应及时书面确认。乙方不通知甲方代表参加而进行的检验是无效的。如甲方代表接到通知后,未按时参加试验、验收及检查,又未事前提出异议,则认为甲方代表自动弃权,乙方在船厂检验部门和船级社验船师参加下的试验、检验结果对双方均为有效。
6.3.4 在检查与试验验收中,如果甲方代表发现本船建造中使用的材料、设备与设计不符或存在施工质量问题,则应将上述情况及时书面通知乙方,乙方接到通知后应迅速处理。如乙方不同意甲方的书面意见,可书面通知甲方代表,阐明理由。在双方意见不一致的情况下,则应相互协商解决。如还有分歧,则应按本合同第十二条的规定来解决。如经裁决,乙方并无不当,甲方应承担由此争议引起工程延期的责任和赔偿乙方停工的损失。但甲乙双方均不得擅自停止与该分歧无关的建造项目,或拒绝验收与该分歧无关的项目。
6.3.5甲方代表在工厂或工地执行公务时,应遵守工厂的规章制度。如非因厂方或其工作人员在工作上的过错而造成的人身伤害时,乙方不承担责任。反之,乙方应承担医疗及善后责任。
第七条 工程变更及修改
7.1 本合同生效后,甲乙双方均应严格遵照执行。如甲乙双方中的任何一方提出解除、停止执行合同,因此而给对方造成的经济损失,由提出方负责赔偿。
7.2 在本船建造合同履行期内,任何一方提出修改变更合同内容,需经双方的认可并签订修改变更的补充协议,该协议为本合同不可分割的组成部分。修改变更引起合同交船期的变动、价格的调整及其他问题均以双方签订的补充协议为准。
7.3 本合同签订后,由于船舶规范、规则修改并要求本船遵守时,由此修改而引起费用增加,应调整本船合同价格。如引起交船期延长,应视为允许的延长。价格的调整和交船期的延长均以双方签订的补充协议为准。
7.4 若甲乙双方就本合同的变更或修改达不成协议,应按本合同第十二条规定办理。
第八条 试航(工程作业与验收)
8.1 通知
乙方应在十五(15)天前以电报或传真方式通知甲方关于本船的下水和试航(工程作业)时间。在七(7)天前以电报或传真方式将确定的时间通知甲方。甲方在收到通知后,应在三(3)天内以传真或电报回复乙方已收到该通知,并按时派员参加本船的试航(工程作业)。如甲方未能提出异议又不能按时派人参加试航(工程作业),则认为甲方已放弃参加本船试航(工程作业)的权利,乙方可在中国船级社验船师参加下进行试航(工程作业)。经验船师签认的试航、试验纪录报告,应视作甲方已认可。
8.2 实施办法
8.2.1 在系泊试验前60天,乙方提出“试车试航(工程作业)大纲”送甲方及船检部门认可。
8.2.2 乙方应在消除系泊试验时发现的缺陷后进行正式试航(工程作业),试航(工程作业)时发现的缺陷应在交船前消除。
8.2.3 本船试航(工程作业)由乙方负责。试航(工程作业)内容按双方认可的“试车试航(工程作业)大纲”进行。甲方应根据安全航行的要求提供必要的人员。试航(工程作业)期间因气候突变不能继续进行时,双方可协商暂时中止试航(工程作业),未完成的项目推迟到其后的第一个气候良好的日子继续进行。试航(工程作业)因气候不良而推迟,应视为不可抗力事件,这种延误应视为允许的延误。
8.2.4 本船试航(工程作业)所需的燃油、滑油、滑油脂的供应及费用均由乙方负责。(工程作业)后所剩余的各种油料,甲方按双方签字认可的数量,以结算日油料市场价格结算,作加减帐处理。
8.3 验收
8.3.1 本船试航(工程作业)结束时,乙方与甲方参加试航(工程作业)的代表应就本船试航(工程作业)结果进行协商并签署相应的试航(工程作业)文件。
8.3.2 如试航(工程作业)结果有不符合全船说明书及试验大纲的要求时,乙方应会同甲方代表调查其原因,并采取有效措施加以补救,必要时组织再试航(工程作业)。
8.3.3 甲方和乙方对本船试航(工程作业)或再试航(工程作业)的结果发生争议时,应尽快协商解决。如通过协商仍达不成一致意见时,应按照本合同第十二条的规定办理。
第九条 交船
9.1 交船日期和地点
9.1.1 本合同交船日期为不迟于______年______月______日,优惠期______天(或本合同交船期为合同生效后______月)。
9.1.2 交船地点:中华人民共和国______省______市______码头。
9.2 交接船
9.2.1 具体交船日期应由乙方提前十五(15)天书面通知甲方,提前五(5)天向甲方确报。
9.2.2 当本船试车、试航(工程作业)发现的缺陷已经消除,收尾工程项目全部完成,所有设备均能正常运转,所有的备品、备件、工具及规定的证件、图纸、技术文件均已点请完毕,本船的技术性能符合本合同和全船说明书的要求,乙方即可通知甲方及甲方代表接船。甲方在接到通知后,并确信本船经验船师检验合格,应按时接船。接船时,由甲方双方委派的代表签署《交接船议定书》。《交接船议定书》签字之日为正式交接船日期。
9.3 交接船证件
交船时,乙方应提交下列证件及有关文件:
9.3.1 《交接船议定书》及倾斜试验报告一式陆(6)份,甲、乙双方各执三(3)份。
9.3.2 按2.2.2款规定的中国船级社(CCS)颁发的证书(正副本各一份)。
9.3.3 乙方质量检查部门的《质量证书》一式肆(4)份。码头试验、航行试验(工程作业)报告一式贰(2)份。
9.3.4 外购设备的随机技术文件、合同证及说明书一式叁(3)份。
9.3.5 备件清单、属具清单一式叁(3)份。
9.3.6 造船厂《建造证书》。
9.3.7 《商业发票》
9.3.8 完工图纸叁套,按双方商定的时间提交。
9.3.9 乙方按本合同第二条第2.2.2.款规定的证书提交甲方。如果证书在交船时未能得到,乙方负责提供认可和签定的临时证书,以供甲方使用,并在交船后十(10)天内补交。
9.4 所有权和风险转移
在建造期内本船所有权归乙方所有,其风险由乙方承担。《交接船议定书》一经甲乙双方签署,本船所有权转移归甲方,其风险同时转移归甲方。
9.5 本船的移离
甲方应在本船交接签字后十五(15)日内,将本船移离交船码头,如逾期不移离,甲方应向乙方支付本船的停泊费。
第十条 不可抗力
10.1 在合同规定的履行期(即交船期)内,因受到地震、海啸、台风、飓风、暴风、水灾、瘟疫等不可抗力的客观因素影响或由于材料设备供应厂发生类似原因造成船舶进度延期应视为允许的延误。
10.2 乙方应在不可抗力事件发生后二十(20)天内书面通知甲方,并附有当地法定部门证明。不可抗力事件停止后,乙方应以同样方式通知甲方。
第十一条 质量保证
11.1 缺陷的责任及范围
自双方代表签署本船《交接船议定书》之日起十二个月内为本船保修期,在此期间凡属乙方施工、工艺以及材料、设备质量而引起的缺陷、故障和损坏,由乙方负责免费修理或更换。
凡属甲方操作或保养使用不当造成的损坏、故障和缺陷以及易损零件的正常磨损,由乙方负责修复,甲方承担费用。
11.2 缺陷的通知
甲方在保修期内发现属于保修范围内的任何缺陷应迅速以传真或其他书面形式通知乙方,并说明损坏和缺陷的性质及程度。该通知的最后有效期为本船保修期满后7天(若以信函形式发出则以邮戳为准)。
11.3 缺陷的处理
11.3.1 本船的保修原则上应由乙方安排进厂修理。
11.3.2 如船舶在乙方所在地之外的港口或在航行中发生属于保修范围内的质量问题,船舶不能等待返回乙方解决时,甲方应及时通知乙方,乙方应及时派人前往确认处理。如乙方不能派人,应在收到甲方电报后五(5)天内电告甲方,甲方可在就近船厂或维修站进行修理或更换机件。如修理或更换项目确属乙方保修范围,由甲方提供有关验船机构的检验证明和修理厂发票,其费用由乙方承担。更换下的零部件,所有权属于乙方,由甲方随船带给乙方。
11.3.3 本船在保修期届满前,甲方提出保修时,应由乙方按照本条款第11.1款的规定安排本船的保修。若甲方提出水线下的保修工程,需要进坞检查确定,则船进坞后如经核实,水线以下确有由于乙方建造质量引起的缺陷的损坏,则进坞费和缺陷修理费用由乙方承担,如水线以下无上述缺陷则进坞费用由甲方承担。
第十二条 争议和仲裁
12.1 甲、乙双方在执行本合同时所发生的一切争执和争议,都应及时协商解决;若协商不成,双方应将本争议提交中国海事仲裁委员会仲裁。仲裁裁决是终局的,都双方均有约束力。
第十三条 合同签署与生效
13.1 本合同的甲、乙双方法定代表人或法定代表人授权的代表在本合同正本上签字并加盖单位印章,在甲方得到其上级主管部门批准并在乙方收到甲方第一期应付款额的百分之五十(50%)后立即生效。
13.2 合同签订后,不因法定代表人或法定代表人授权的代表的变动、变更或解除;甲乙双方任何一方发生合并、分立时,由变更后的当事人承担或分别承担履行合同的义务和享受应有的权利。
13.3 本合同正本一式两份,双方各执一份,副本甲方________份,乙方________份,副本及合同附件具有同等效力。
甲方:____________________ 乙方:______________________
法定代表人签字:__________ 法定代表人签字:____________
日期:____________________ 日期:______________________
建造合同 篇24
甲方(发包方):
身份证号: 乙方(承建方):
身份证号:
根据《建筑法》,《经济合同法》及有关法律法规,甲乙双方在平
等自愿、公平合理的原则下,通过双方协商就私人住宅建房工程达成协议,为规范建造私人住宅工程中双方的民事行为,特制定本合同规定,希望双方严格执行,共同遵守。
一. 建筑工程概况:
1.工程名称:笑嘻嘻住宅楼
2.地点:新湾村三组新德公路旁
二. 建筑设计要求:
1.乙方按照设计图纸或甲方提出的要求承建。
2.本工程为砖混结构住宅三层建筑,面积总计约 m2。
3.主体工程的建筑:包括主体、墙体、梁、柱、楼梯、楼面、内磨砂外贴砖、钢筋绑扎、楼梯及地面混凝土浇灌。
4.外装修:外墙面均为瓷砖勒缝贴面,外扬天面磁粉装饰,顶层散水处理。
5.内装修:内墙面均为水泥砂浆抹面,所有房间地面均为水泥地面。
三.工程造价及承包施工方式:
1.每平方米 元,包括主体、墙体、梁、柱、楼梯、楼面、内磨砂外贴砖、钢筋绑扎、楼梯及地面混凝土浇灌。
2.甲方将房屋以包工不包料的方式承包给乙方建筑。乙方自带建筑所需的一切工具,包括搅拌机、震动器等施工机械以及模板、脚手架等,费用由乙方自理。所有人工的吃饭、住宿、抽烟等问题由乙方自己解决,费用由乙方自理。
四. 施工安全:
1.安全责任:文明施工,乙方在施工过程中,必须按照建筑业规定的操作要求精心施工,如出现死亡、工伤,或因施工造成他人损伤等事故,一切均由乙方自行承担,甲方概不负责。如果施工人员需要参加生命财产、机械设备、意外伤害等方面的保险,则由乙方负责办理并支付一切保险费用。
五、质量要求:
1.工程质量:乙方应当按照国家规定的房屋质量标准和要求组织施工,主体四角端正,墙面平整,垂直误差不超过2厘米。墙体粉刷:阴阳角垂直,墙面误差率不超过3毫米。不合格由乙方负责返工,返工费由乙方负责。
六、双方责任:
甲方负责水电供给及原材料及时进场,乙方必须提前两天通知甲方购买所需建筑材料。乙方必须保证工程质量,按设计图纸和甲方要求施工,如果甲方图纸或方案有改动,甲方应提前向乙方说明,乙方应按照甲方要求施工,节约材料,并保管好材料,不得丢失。
七.建房工期:
建房工期为 天, 自 年 月 日开始施工算起。开工起 个工日完工。
八. 付款方式:
乙方进场后,甲方将按工程进度付款。
1.建筑人员及设备进场付 元。
2.每一个楼层完工付 元。
3.其余款项待验收交工,验收合格后—次付清。
九.其它未尽事宜,由甲乙双方协商解决。
1.违约责任:任一方违约支付守约方违约金伍仟元整,并承担相应经济和法律责任。
2.如有未尽事宜,双方协商的补充协议与本合同享有同等效力。
3.本协议经双方签字即发生法律效力,双方应全面遵守。本合同一式两份,双方各执一份。
甲方:乙方:年月日:
建造合同 篇25
甲方:泉州市泉港区东张农民蔬菜专业合作社
乙方:泉州市XX公司
一、工程名称:设施农业智能温控大棚项目
二、施工地点:界山镇后望林场
三、工程造价:约计150万元(不含税)
四、承包方式:乙方包工包料,保修期:一年
五、工程规模:建造连栋智能温控大棚4个,总面积6672?O(J9_________24_________2=432?O;?J8_________36_________9=2592?O;?J8_________32_________3=768?O;?J24_________40_________3=2880?O).
六、大棚建设价格:连栋智能温控大棚4个,按225元/平方结算,计算方法:按棚内面积算。
七、建造标准:工程按照省定建设标准,施工质量按闽农计【_________】324号标准_____。具体为:
1、主体规格
棚体高度不低于4.6m,肩高不低于3.0m,外遮阳高不低于5.2m,跨度8m.
2、主要材质
立柱方管外径不少于80m_________60m,壁厚不少于2.5mm;副立柱、横档方管外径不少于50_________50mm,壁厚不少于2mm;柱距不少于4m,立柱根基水泥浇筑。
拱管圆管外径不少于32mm,壁厚不少于1.5mm,拱距不少于1m.
外遮阳立柱、纵梁、横梁方管外径不少于50_________50mm,壁厚不少于2mm。?水槽壁厚不少于1.5mm镀锌板折弯成型。
以上所有钢架结构骨架均采用热浸镀锌管。现场组装时全部采用螺栓紧固,内外遮阳系统均采用齿轮齿条、电动收网系统。
3、主要配套设施设备
水帘风机自动降温系统;电动内、外遮阳系统;自动化水肥一体化_____设施;防虫网等物理防虫装置及出入口缓冲间。
八、甲方权利及义务:
1、在施工过程中,甲方有权监管工程质量,材料标准及工程进度。
2、保证水电路三通,并提供无偿使用,施工地段场地平整。
3、负责棚区内的社会关系及治安安全,确保施工人员的安全。
4、按合同拔付工程款,保证工程进度不受款项影响。
5、所发生的所有税、管理费等由甲方负责。
6、因场地水多无法施工时,甲方负责排水。
7、分步分项验收,以免完工后发生质量纠纷。
九、乙方权利及义务:
1、必须按规定的材料规格、施工标准进行施工。
2、乙方对工程质量、进度负责。
3、在正常情况下不能按期交工,给甲方造成的损失由乙方负责。
4、如出现工程款拖付及拒付,乙方有权停工,并追回由此造成的乙方损失。
5、一年内如出现质量问题,乙方负责维修,注:天灾、大风、暴雪、洪水、侵泡,不可抗力等因素除外,甲方使用和维护大棚不当出现问题除外。
十、付款方式:
1、乙方智能温控大棚材料进场时,甲方付工程款总造价40%。
2、机械进入场地,甲方付工程款总造价的20%。
3、工程施工完后,甲方付工程款总造价的20%。
4、验收合格后,甲方付工程款总造价的15%。
5、验收合格后扣5%作为维修费,一年内无质量问题时,甲方一次付清。?十一、竣工日期:自合同签订之日起70天内完成工程建设任务,注:阴雨天气、停水、停电、大风等工期延期。
十二、场地三通一平工程甲方负责,不在乙方工程量内,本合同签订后,即受法律保护,双方出现争议时协商解决,协商不成时由人民法院_____。
十一、本合同一式肆份,双方各执两份,自签字盖章之日生效。
甲方:泉州市泉港区东张农民蔬菜专业合作社
法人代表(签章):
乙方:泉州市XX公司
法人代表(签章):
年
日?月
建造合同 篇26
甲方:
乙方: 身份证号码:
因发展需要,甲方需聘用国家注册二级建造师(房建专业),经过真诚协商,双方达成如下聘用条款:
一、注册聘用期:甲方聘用乙方的注册期限为 壹 年,每年薪金为: 元整,薪资支付方式为:壹年一付。
二、乙方应向甲方提供二级建造师执业资格合格证、毕业证书、身份证(原件)、乙方一寸二寸彩色相片各4张,以及其它甲方注册过程中需要的一些证明材料。
在当日验证完成双方签定本合同后,甲方即付给乙方 元整,并报销原返程车旅费。乙方的身份证和毕业证甲方在报送上级主管部门审核后归还(十五个工作日左右)。第二年若甲方继续聘用乙方,第二年薪金由甲方在合同到期前提前一个月一次性支付给乙方。
乙方姓名: 开户行: 银行帐号: 。
三、甲方办理注册期限为50个工作日,超过 50 个工作日视同注册成功,必须付给上述款项;若因乙方原因,导致不能完成注册时,乙方应将已收到的薪资全部退还给甲方,并收回全部证件(甲方均应出具有效书证予以证实)。若是甲方单位原因导致乙方不能完成注册的,则退还首付款的50%。
四、聘用期间,若国家开通对建造师继续教育,乙方在聘用期内的继续教育(含继续教育期间标准的差旅住宿费用)均由甲方负担,乙方凭相关票据向甲方报销。如因甲方需要乙方到公司配合的,甲方应提前与乙方协商,报销原返程车旅费、食宿费。
五、完成注册后,乙方只作为甲方资质升级和年检之用,乙方的“注册证书、执业资格证书”交由甲方妥善保管,其注册章及其他证书原件应交还给乙方。在甲方办理资质申报、年检或有关部门检查时,若需有关证书原件、印章等,乙方应及时配合提供,不得延误。
若超出以上范围,甲方要使用乙方证书或印章时,则应经双方协商,经乙方书面同意后,方可使用,并付给相应报酬或津贴。如甲方不经乙方同意私自使用所引起的一切后果由甲方承担。
六、在合同期内,甲方应为乙方在《执业手册》上登记聘用期间的执业情况,并为乙方办理该证的年检工作,年检费用由甲方支付,乙方若有其他需要注册的证件,甲方有义务协助乙方办理相关注册手续;甲方保证乙方资格证件的年检及时、有效,保证乙方继续教育等工作的及时进行。
七、解聘:乙方必须在聘用合同的壹年期满后,才可转注,在合同期满时,甲方应提前30天出具乙方的解聘证明、职业道德证明等有关转注册证明,方便乙方办理转注的手续。乙方要求提前解聘的,也应提前30天通知甲方说明具体情况,并应退还已收的辞聘后期间的薪资,且甲方不再负担其再教育学习费用。甲方要求提前解聘的,则应支付剩余期间的薪资。
八、续聘:聘用期满,双方有意签订续聘合同,具体事宜由双方另行协商。
九、违约责任:
甲方负责乙方在注册期内的再教育学习的一切费用及手续,如甲方没有在注册期满前完成乙方的再教育学习手续和转注册的证明材料,造成乙方无法转注的,甲方应向乙方赔偿因此延期的薪金,且由甲方办理转注手续,直至乙方能转注为止。
如果由于甲方原因发生乙方的证件丢失,甲方应赔偿乙方相关损失,金额如下:若资格证、注册证丢失,甲方负责补办,如造成经济损失由甲方进行赔偿;由于大学文凭(原件)无法补办,若丢失损毁,甲方应赔付乙方伍万元整;如因乙方自身原因造成不良后果,甲方概不负责。12
二级建造师聘用合同
十、本合同所指薪资均为税后金额,如需缴税,均由甲方承担。
十一、双方如有争议或纠纷时,可协商或提请仲裁部门仲裁。
十二、本合同一式两份。双方各执壹份,具同等效力。
甲方:
乙方:
代表人: 电话:
年 月 日 年 月 日
建造合同 篇27
一、建造合同概述
根据《中华人民共和国合同法》,建设工程合同是承包人进行工程建设,发包人支付价款的合同,其包括工程勘察、设计、施工合同。
(一)建造(施工)合同的特征 了解
建造合同属于经济合同范畴,是一种特殊类型的经济合同,其主要特征表现在:
1.针对性强,先有买主(客户),后有标的(即资产);
2.建设周期长,资产的建造一般需要跨越一个会计年度,有的长达数年;
3.建造的资产体积大,造价高;
4.建造合同一般是不可撤销合同。
例题:下列关于建造合同的特征表述,不正确的是( )
A.先有买主,后有标的
B.资产的体积大、造价高
C.资产建设周期长
D.建造合同一般为不可变更合同
答案:D
(二)固定造价合同和成本加成合同
此处以项目管理中的合同管理为准。
例题:建筑工程公司与建设单位签订了一份大型资产建造合同。合同规定,以双方约定的基本成本为该资产的实际成本,合同总价款由实际成本加15%来确定,该合同是( )。
A.成本确定价款合同
B.成本加成合同
C.固定造价合同
D.浮动造价合同
答案:B
二、合同的分立与合并(分开或者合并确认收入)
建造合同中有关合同分立与合同合并,实际上是确定建造合同的会计核算对象。
一般情况下,企业应以所订立的单项合同为对象,分别计算和确认各单项合同的收入、费用和利润。
例题:建造合同中有关合同分立与合同合并,实际上是确定建造合同的( )。
A.收入
B.成本
C.会计核算对象
D.风险
答案:C
1.建造合同的分立
一项包括建造数项资产的建造合同,同时满足下列条件的,每项资产应当分立为单项合同:
(1)每项资产均有独立的建造计划;
(2)与客户就每项资产单独进行谈判,双方能够接受或拒绝与每项资产有关的合同条款;
(3)每项资产的收入和成本可以单独辨认。
2.建造合同的合并
(1)该组合同按一揽子交易签订;
(2)该组合同密切相关,每项合同实际上已构成一项综合利润率工程的组成部分;
(3)该组合同同时或依次履行。
例题:如果一项建造合同包括多项资产,每项资产应分立为单项合同处理,下列各项中不属于必备条件的是( )。
A.每项资产均有独立的建造计划
B.每项资产的收入和成本可以单独辨认
C.建造承包商与客户就每项资产单独进行谈判,双方能够接受或拒绝与每项资产有关的合同条款
D.多项资产按一揽子交易合同签订
答案:D
三、合同收入的内容
建造合同的收入包括两部分内容:合同规定的初始收入和合同变更、索赔、奖励等形成的收入。
(一)合同规定的初始收入
合同规定的初始收入是指建造承包商与客户在双方签订的合同中最初商定的合同总金额,它构成了合同收入的基本内容。
(二)因合同变更、索赔、奖励等形成的收入
建造承包商不能随意确认这部分收入,只有在符合一定条件时才构成合同总收入。
1.合同变更,是指客户为改变合同规定的作业内容而提出的调整。
2.索赔款是指因客户或第三方的原因造成的、向客户或第三方收取的、用以补偿不包括在合同造价中成本的款项。
3.奖励款是指工程达到或超过规定的标准,客户同意支付的额外款项。
变更索赔奖励属于建造合同收入,也属于施工企业的主营业务收入。
【20xx】24.建造合同收入包括规定的初始收入和( )形成的收入。
A.材料销售收入
B.合同变更、索赔、奖励
C.让渡资产使用权
D.合同变更、劳务作业
答案:B
四、建造(施工)合同收入的确认
要准确地进行建造合同收入的确认与计量,首先应判断建造合同的结果能否可靠地估计。
如果建造合同能够可靠地估计,应在资产负债表日根据完工百分比法确认当期的合同收入。
所谓结果能够可靠估计,指的是完工的比例能够可靠估计。
(一)合同结果能够可靠估计时建造(施工)合同收入的确认
1.合同结果能够可靠估计的标准
(1)固定造价合同
①合同总收入能够可靠地计量;
②与合同相关的经济利益很可能流入企业;
③实际发生的合同成本能够清楚地区分和可靠地计量;
④合同完工进度和为完成合同尚需发生的成本能够可靠地确定
(2)成本加成合同
①与合同相关的经济利益很可能流入企业;
②实际发生的合同成本能够清楚地区分和可靠地计量。
如果建造合同能够可靠地估计,应在资产负债表日根据完工百分比法确认当期的合同收入。
2.完工百分比法
完工百分比法是指根据合同完工进度来确认合同收入的方法。
完工百分比法的运用分两个步骤:
第一步,确定建造合同的完工进度,计算出完工百分比;
第二步,根据完工百分比确认和计量当期的合同收入。
必须先计算完工百分比,才能计算收入。
完工百分比的确定
(1)根据累计实际发生的合同成本占合同预计总成本的比例确定。
累计实际发生的合同成本按照权责发生制确认,具体来说就是不包括:施工中尚未安装或使用的材料成本等与合同未来活动相关的合同成本,也不包括在分包工程的工作量完成之前预付给分包单位的款项。
【例1Z102032-1】某建筑业企业与A业主订了一项合同总造价为3 000万元的建造(施工)合同,合同约定建设期为3年。
第1年,实际发生合同成本750万元,年末预计为完成合同尚需发生成本1 750万元;
第1年合同完工进度=750/(750+1 750)×100%=30%
第2年,实际发生合同成本1 050万元,年末预计为完成合同尚需发生成本700万元。
则:
第2年合同完工进度=(750+1 050)÷(750+1 050+700)×100%=72%
此处需要掌握。
(2)根据已经完成的.合同工作量占合同预计总工作量的比例确定
这种方法简单,也可以认为是一种形象进度。
【例1Z102032-2】某建筑业企业与B交通局签订修建一条150公里公路的建造(施工)合同,合同约定工程总造价为60 000万元,建设期为3年。该建筑公司第1年修建了45公里,第2年修建了75里。则:
第1年合同完工进度=45÷150×100%=30%
第2年合同完工进度=(45+75)÷150×100%=80%
(3)根据已完成合同工作的技术测量确定
了解,无考点。
3.当期完成建造(施工)合同收入的确认
这个地方则需要计算的是各年的收入,与完工进度不同。
建造(施工)合同收入的确认分两种情况,
一种是当期完成建造(施工)合同收入的确认,
另一种是(当期未完成建造(施工)合同)在资产负债表日建造(施工)合同收入的确认。
当期完成的建造(施工)合同应当按照实际合同总收入扣除以前会计期间累计已确认收入后的金额,确认为当期合同收入,即:
当期确认的合同收入=实际合同总收入-以前会计期间累计已确认收入。
因为当期完成了,则总收入是能确定的。当然实际中不尽然。这种比较简单,考试不考。
4.资产负债表日建造(施工)合同收入的确认
当期不能完成的建造(施工)合同,在资产负债表日,应当按照合同总收入乘以完工进度扣除以前会计期间累计已确认收入后的金额,确认为当期合同收入。
即:
当期确认的合同收入=合同总收入×完工进度一以前会计期间累计已确认的收入
【例1Z102032-3】某建筑业企业与某业主就一栋工业厂房的建造,签订了总造价为3 500万元的固定造价合同,合同约定的工期为3 年。假定经计算后第1年完工进度为30%,第2年完工进度为70%。第3年该厂房全部完工交付使用。则:
第1年确认的合同收入
=3 500×30%=1 050(万元)
第2年确认的合同收入
=3 500×70%-1 050=1 400(万元)
第3年确认的合同收入
=3 500-(1 050+1 400)=1 050(万元)
多项选择题【20xx】72、某建筑企业与甲公司签订了一项总造价为1 000 万元的建造合同,建设期为2年。第1年实际发生工程成本400万元,双方均履行了合同规定义务,但在第二年末由于建筑企业对该项工程的完工进度无法可靠的估计,所以与甲公司只办理了工程款结算360万元,随后甲公司陷入经济危机而面临破产清算,导致其与款可能无法收回,则关于该合同收入与费用确认的说法,正确的有( )。
A .合同收入确认方法应采用完工百分比法 B . 1 000万元可确认为合同收入 C.360万元确认为当年的收入 D . 400万元应确认为当年费用 E . 1 000万元可确认为合同费用
答案:CD
选择题【20xx】50. 某造价合同总价为6 000万元,合同工期3年,若第一年完工进去为20%,第二年完工进度为60%,第三年工程全部完工交付使用。则第三年应确认的合同收入为( )万元。
A.6 000
B.3 600
C.2 400
D.1 200
答案:C
完工百分比法要求必须结果能可靠估计。
(二)合同结果不能可靠地估计时建造(施工)合同收入的确认
当建筑业企业不能可靠地估计建造(施工)合同的结果时,就不能采用完工百分比法。
【例1Z102032-4】某建筑业企业与B公司签订了一项总造价为800万元的建造合同,建设期为2年。第1年实际发生工程成本300万元,双方均能履行合同规定的义务,但在年末,建筑公司对该项工程的完工进度无法可靠估计。
由于B公司能够履行(已经发生的)合同,估计当年发生的成本均能收回,所以收入可以确认。教材给的说法是确认300万,实则有误,应根据能收回的数额确定。
1.合同成本能够回收的,合同收入根据能够收回的实际合同成本来确认,合同成本在其发生的当期确认为费用。
假定上例中该建筑业企业与B公司只办理工程价款结算220万元,由于B公司陷入财务危机而面临破产清算,导致其余款项可能难以收回。在这种情况下,该建筑公司只能将220万元确认为当年的收入(300万元应确认为当年的费用)。
2.合同成本不能回收的,应在发生时立即确认为费用,不确认收入。
此处不能收回指的是完全不能收回。
建造合同 篇28
1环境保护建造合同
治理深圳河工程最显著的特色是从管理着手把环境保护工作做到实处。在建造合同(施工合同)中列出专章“环境保护工程”,详细而明确列出了承建商在环境保护方面应承担的义务和责任,明确施工中应执行的环境保护工作和应采取的环境保护措施包括以下几个方面。
1.1须提交的资料与要求
承建商必须遵守国家、广东省、深圳经济特区和香港特别行政区政府颁布的相关环境保护法规、条例和指引,以及《治理深圳河第四期工程环境影响报告书》、香港《环境许可证》(EP-430/20xx)和《环监手册》中有关减免工程对环境影响的要求和建议。开工前14d内,承建商须向工程主任和环监组长提交一份承建商的工程管理资料,包括管理框架、组织结构图、各级负责人姓名及联系资料。开工后14d内,承建商必须根据《环境许可证》《环监手册》和本技术规范的要求和建议,制定环境管理计划和废物管理计划各一份,提交工程主任和环监组长。前者应详细说明建造过程中空气、噪音、水质和废物污染控制计划,以及防止景观、生态破坏的应对措施,证明其符合环境影响评估报告的要求或更好,并拟备详细的执行计划;后者应详细说明施工期间避免产生各类废物的措施,废物的再利用(如开挖料回填)、回收、循环改造、收集、运送和弃置安排,一份详细的污染土分布图,所有污染土弃置地点及其数量的记录系统,并有详细的执行计划。环境管理计划须经工程主任和环监组长的批准。
1.2防止扰民与污染
承建商在工程建设过程中,应与施工区附近的居民和团体建立良好的关系,采取合理的预防措施避免扰民施工作业,其施工方案应尽可能减少对环境产生不利影响,以防止公害的产生为主,而不是在扰民发生后再行消除。对于受噪音骚扰的居民及团体,应在施工作业前予以事前通知,并随时报告工程进展情况。在此之外,承建商还应提供投诉。由于施工活动引起的环境污染,承建商应及时采取有效措施加以控制,并达到规定的限值,由此引起的所有费用和工期的延误,均由承建商负责。另外,承建商应按深港双方政府有关法规、规定办理施工许可证,并将其复印件交工程主任,另外,还须向工程主任报告有关申请情况。
1.3空气中粉尘减少措施
工程开工前30d,承建商应充分考虑到施工过程中可能产生的粉尘污染,在选用或购置施工设备时,要选配或安装有效的除尘设备,使其与生产设备同时运行。施工期间,深圳一侧的承建商应遵守中华人民共和国国家标准《环境空气质量标准》(GB3095—1996)的二级标准,保证在施工场界及敏感受体附近的总悬浮颗粒物(TSP)的浓度值控制在其标准值内;香港一侧的承建商应遵守香港特别行政区的《空气质量污染控制条例》(APCO)及其补充规定,保证其敏感受体附近的TSP浓度值不超过《空气质量目标》(AQO)及香港环境监察与审核(环监)的规定承建商应安装冲洗车轮设施并冲洗所有离开工地的车辆,确保所有离开工地的车辆不把泥土、碎屑及灰尘等类似物体带到公共道路路面,洗车轮设施的水应经常更换,淤泥应定期去除。承建商应将洗车轮设施的详细计划在实施建设前提供给工程主任和环监组长,洗车轮设施应在任何开挖施工之前准备就绪,承建商还必须在清洗设施和公共道路间修建一段用以过渡的硬地路面。另外,承建商有责任设计和实施《环评报告》和《环监手册》推荐的空气污染控制和纾缓措施,并承担相关一切费用。
1.4噪音污染控制
施工期间,深圳一侧的承建商应遵守中华人民共和国国家标准《建筑施工场界环境噪声排放标准》(GB12523—20xx)对施工场地产生的噪音加以控制(见表3);香港一侧的承建商应遵守香港特别行政区的《噪音控制条例》(NCO)及其补充规定,将敏感受体噪音水平控制在此条例规定的限值内。承建商在制定施工计划、施工方法及降噪措施时,应充分考虑噪音对周边环境的影响,委派环保专职人员监督实施,使施工场界和敏感受体附近的噪音水平能达到国家和香港特别行政区噪音控制标准并保证。施工期间,承建商应于施工场地与周边地区和敏感受体之间合理安装声障设施,以有效阻隔噪音向施工场地周边和敏感受体的方向传播。采用的声障设施要设计合理、性能优良、坚固耐用。声障的设计应于施工前14d送交工程主任和环境监察审核小组审查、通过。当施工期间的环境监察结果超出《环监手册》的水平时,承建商应实施《环监手册》的行动计划,在实施工程主任同意的纾缓措施以前,承建商应停止施工活动。实施纾缓措施的一切费用和工程延误的责任和费用皆由承建商承担。如果承建商实施了上述降噪措施和环境影响评估报告推荐的措施后,仍不足以将噪音降低到可接受的水平,承建商应放慢或停止全部(或部分)施工活动,直至超标停止。同时应与工程主任和环境监察审核小组协商其他的纾缓措施,征得工程主任同意后实施。
1.5水污染控制和废弃物料的去除
工程开工前,承建商应密切配合工程主任和环境监察审核小组对其施工设备、防污设施及措施、拟采用的施工方法等进行检查和审核。承建商应按照《环境许可证》的要求进行河道疏浚,采取合理的操作程序,尽量减少疏浚过程中沉积物的再悬浮和污染物的再释放,同时还应避免在雨季(4月~10月)进行疏浚工作。《环境许可证》要求的疏浚方法须在开始疏浚施工前提交一份疏浚方法报告给工程主任及香港环保署,以获其批准。在枯水期疏浚施工时,应在施工段上游200m和下游500m处布设防泥帘幕,横跨河道整个断面,以有效防止再悬浮泥沙向上下游迁移,挖泥工程先进时防泥帘幕须保持关闭,并加以保护维修。应特别注意降低抓斗的提升速度,将泥沙的再悬浮降低到最低程度。如果水质监测结果显示有超标情况,则应降低开挖强度10%,如水质仍未达标,则继续降低开挖量,直至水质达标。按照环境许可证的要求,深圳河四期工程合同A与合同B的每天总水下开挖量不得超过996m3,因此承建商须于工程开展前七天将预计开挖量通知工程主任,并按照获批复的工程量进行水下开挖工程。施工过程中,承建商应每天记录当天挖出的污染土和非污染土的数量、挖出物的去向和运泥车的容量,并将记录复本提交环监组长,同时应注意挖掘工作尽可能与河道隔离,以免挖掘土进入河道污染水体。施工期间的水质监察结果超出《环监手册》的水平时,承建商应实施《环监手册》的行动计划。承建商有责任设计和实施环境影响评估报告推荐的水质污染控制和纾缓措施。在实施工程主任和环监组长同意的纾缓措施以前,承建商应停止施工活动,实施纾缓措施的一切费用和工程延误的责任和费用皆由承建商承担。如果承建商实施了上述水质污染控制措施和环评报告推荐的措施后,仍不足以将SS浓度降低到可接受水平,承建商应放慢或停止全部(或部分)施工活动,直至超标停止。同时应与工程主任和环境监察审核小组协商其他的纾缓措施,征得工程主任同意后实施。
1.6水土保持要求
新河道与重配工程的开挖应尽量采用干挖,疏浚和开挖施工作业应尽量安排在干季进行。开挖料如临时堆放,承建商应选择不易受径流冲刷侵蚀的场地,并在其周边修建临时排水沟引排周边汇水。弃土临时堆放位置、范围、存放时间及防护措施须事先征得工程主任和环监组长的批准。物料及弃土露天堆放应择不易受冲刷的场地并加盖,周边修建临时排水沟,引排周边汇水。另外,尽快植草种树,恢复施工迹地(此等费用已包含在弃土、河道、堤防、重配及环保工程等项目单价中)。
1.7生态保护要求
承建商应尽量避免在工地内造成不必要的生境破坏,严禁在工地外砍伐树木。未经工程主任和环监组长批准,承建商不得于施工区附近的任何地点倾倒废弃物。在施工场地内标示出有特殊意义的树木以及野生动物生境,并且设置必要的围栏以提供临时保护,防止施工人员及其他人员进入对其进行扰动,这种临时性保护措施应当根据工程主任和环监组长的指示而撤消。应减少对野生动物的滋扰,尤其是在11月至3月(包括这两个月)的鸟类越冬季节,应尽可能减少对其扰动。承建商需在每年的10月份提交一份有关的施工计划,合理安排鸟类迁徙期的施工作业,只有正在进行且不能延误的施工活动得以继续,并且仅仅允许一些对合同的完成有关键影响的施工得以开始。
1.8环境保护培训
承建商须保证其聘用的工地管理人员已参加并完成由CITA或其他经工程主任同意的类似培训机构组织的“工地管理人员环境管理课程”。为了达到本条款的目的,现场管理人员包括了承建商代表、项目经理等。如有未参加该课程的工地管理人员,承建商须安排该人员在其任职日后的14d内参加所要求的课程,并在上述日期后6个月内完成课程。承建商须确保环境监督员按条款22.11(4)参加并完成由CITA或其他经工程主任同意的类似培训机构组织的“环境监督员环境保护课程”。如有未参加该课程的人员,承建商须安排该人员在其任职日后的14天内参加所要求的课程,并在上述日期后的6个月内完成课程。如果环境监督员事先已经完成了由CITA组织的“环境监督员环境保护课程”,该人员被视为符合该子条款的要求。根据条款23.08,承建商须保证地盘迎新培训包含了针对本工程或合同相关工程的职员和工人的环境管理及安全培训。迎新培训中环境部分须由环境管理主任或环境监督员或指派人员来执行,培训的频率及内容须获得工程主任的批准。培训内容应包括组织架构、职责责任、措施、目标、内部规程等。迎新培训的时长至少为15min,并且涵盖了环境管理所需的内容。
1.9环境保护报告
建商须在工地安全及环境管理委员会会议中提交用以讨论的每月环境管理报告,且由承建商代表背书,报告内容如下。
(1)污染事件及纠正措施的总结,主要包括:投诉事项;由香港环保署签发的减少污染通告;由香港环保署在检查中指出的违规现象;环境违规的传唤。
(2)在接下来的两个月中可能对周围环境造成环境影响或引起滋扰的活动清单,及建议的控制或纾缓措施,主要包括:按照条款22.13,下月的培训计划及上月所安排和执行的培训记录;最新的环境管理组织图;检查中指出的欠缺与不足的总结报告,每周环境巡查,防止类似情况再发生的跟进措施和纠正办法。
2环保工作的落实
2.1从管理上强化环保工作
治理深圳河工程建造合同要求承建商须指派一名环境管理主任来监管工程中所有的环境事务,并至少另指派一名工地人员(环境监督员)来协助环境管理主任完成工程的环境检查、监察及管理工作。
2.2从教育上加强环境意识
建造合同要求,承建商须保证其聘用的工地管理人员已参加并完成由CITA或其他经工程主任同意的类似培训机构组织的“工地管理人员环境管理课程”。承建商还须确保环境监督员参加并完成由CITA或其他经工程主任同意的类似培训机构组织的“环境监督员环境保护课程”。同时承建商除进行包含了针对本工程或合同相关工程的职员和工人的环境管理及安全培训的迎新培训外,每月还须进行包含工地管理人员、工地监督人员以及工人的环境和废弃物管理培训。
2.3从资金上保证环保执行
第四期工程对于环保资金的使用也有明确的规定,除环境保护工程外,包括环境和废弃物管理培训等都有相应的经费,对此承建商也做出了积极响应。购置专业洒水车用于工地的降尘、日清洁、月清洁和绿化。第四期工程合同A2#营地的生活污水,由于无法接入城市下水系统,投资10余万元,采用经过化粪池及MBR膜生物反应装置处理达标后再排入深圳河,这在其他水利工地还属罕见。
2.4从制度上加强环境管理
按建造合同要求承建商必须根据《环境许可证》《环监手册》制定环境管理计划和废物管理计划,并随着工程的进展,针对不同的施工阶段和施工项目,更新环境管理计划和废物管理计划。承建商除了在每周的工程例会上汇报工地一周的环境状况外,还须在工地安全及环境管理委员会会议中提交用以讨论的每月环境管理报告,汇报污染事件及纠正措施的总结,以及在接下来的2个月中可能对周围环境造成环境影响或引起滋扰的活动清单,及建议的控制或纾缓措施和下月的培训计划及上月所安排、执行的培训记录。
3结论
治理深圳河工程根据国家、地区,特别是香港特区环境管理要求和特点,在建造合同中明确规定了承建商在施工中须履行的环境保护责任和义务,列出专章,详细提出了环境保护合同条款,明确承建商在施工过程中的环境保护工作和采取的环境保护措施,以及可使用的环境保护资金,使该工程环境保护落实到实处。在建造合同中明确环境保护工作及措施,并通过资金监管,充分达到了环境保护措施的可行性、可操作性和可控性目的,不失为建设项目施工环境保护工作的典范。
建造合同 篇29
目录
第一条 工程内容、建造数量及依据
第二条 概述与船级
第三条 材料和设备
第四条 合同价格及付款办法
第五条 合同价格的调整
第六条 监造
第七条 工程变更及修改
第八条 试航与验收
第九条 建造地点与交船
第十条 不可抗力事件
第十一条 质量保证
第十二条 合同纠纷的解决
第十三条 合同签署与生效
本合同于______年_____月_____日在_________________地点由下述两方签订:
甲方:_____________________________(单位全称)
法定代表人:_______________________
法定地址:_________________________(地址全称)
邮政编码:_________________________
乙方:_____________________________(单位全称)
法定代表人:_______________________
法定地址:_________________________(地址全称)
邮政编码:_________________________
第一条 工程内容、建造数量及依据
1.1 工程内容:___________________________________________
1.2 建造数量:___________________________________________
1.3 建造依据
本船由甲方委托_________进行设计,技术设计经送CCS审查认可,由_________负责施工设计。下列文件作为本船建造依据,并成为本合同不可分割的组成部分:
(1)技术规格书(图号:_________)
(2)全船说明书(图号:_________)
(3)船体结构说明书(图号:_________)
(4)舾装说明书(图号:_________)
(5)轮机说明书(图号:_________)
(6)空调说明书(图号:_________)
(7)机械说明书(图号:_________)
(8)电气说明书(图号:_________)
(9)总布置图(图号:_________)
(10)舯横剖面图(图号:_________)
(11)机舱布置图(图号:_________)
(12)轮机国内设备订货明细表(图号:_________)
(13)轮机进口设备订货明细表(图号:_________)
(14)电气国内设备订货明细表(图号:_________)
(15)电气进口设备订货明细表(图号:_________)
(16)甲板机械订货明细表(图号:_________)
(17)舱室设备订货明细表(图号:_________)
(18)主要舾装设备订货明细表(图号:_________)
(19)工程机械设备订货明细表(图号:_________)
(注:凡造价在500万元以上的船舶应给出上述可能的全部图号,500万元以下的船舶应给出(1)、(2)、(5)、(8)、(9)、(11)和主要订货明细表图号;有与本合同不可分割的附件应列入此款中,如:本船供图协议、由设计单位提供的并经甲、乙双方共同认可的厂商表、由甲方委托乙方办理的进口设备的明细表以及有关文件的文号等。)
如图纸与全船说明书不一致时,以全船说明书为准。如全船说明书与本合同不一致时,则以本合同为准。
1.4 工程编号(指工厂的生产工程编号)
乙方必须以自己的设备、技术和劳力,完成船舶的建造,不经甲方同意,不得把接受的船舶建造任务转让给第三方,包括乙方自办的第三产业。
1.5 乙方承担甲方提出的有关技术方面的保密义务。
第二条 概述与船级
2.1 概述
2.1.1 用途____________________________________________
2.1.2 船型____________________________________________
2.1.3 航区____________________________________________
2.1.4 船舶主尺度______________________________________
总长_____________________________________________________
垂线间长_________________________________________________
型宽_____________________________________________________
型深_____________________________________________________
设计吃水_________________________________________________
2.1.5 船舶主要工程技术指标
(1)系柱拖力:最大系柱拖力为_________千牛顿;
(2)吊重:_________________(给出何种限制条件下的起吊重量)
(3)挖深及其它工程作业指标:_________________________(给出何种限制条件下的挖深及其工程指标要求)。
2.1.6 动力装置
主机生产厂:_________________主机型号:________主机台数:________
最大持续功率_______________(千瓦)转速
齿轮箱生产厂及型号_________________速比
发电机组:原动机型号_________功率(千瓦)_________转速_______台数
发电机型号:_________功率(千瓦)_________生产厂_________________
2.1.7 航速、主机燃油消耗率和自持力
(1)试航速度:船舶在试航压载状态,吃水_______米,船体无污底,风力小于蒲氏风力3级,深静水,主机功率为_______千瓦,航速不小于_________公里(或节)。
(2)燃油消耗率:主机在其制造厂车间座台上试验,在ISO标准工况下,其合同最大持续功率_______(千瓦),转速为_________转/分,燃油消耗率为_________克/千瓦 小时+3%。
(3)自持力:本船主机在常用功率(85%MCR),油水舱柜装满,续航力不小于_________公里(或节),自持力不小于______天
2.1.8 建造工艺
本船建造工艺按乙方的造船工艺和惯例进行。
2.2 船级和规范
2.2.1 本船的建造、入级,应满足本船建造合同签字之日已公布实施的必须满足的本船说明书中规定的规范和规则及有关国际公约的规定。由中国船级社代表中国政府对船舶进行法定和船级检验,按中国船级社的规范和规则进行设计,建造和检验,并取得下列船级符号:(★CSATugLceclassB,★CSM)
2.2.2 本船交船时,应取得中国船检局的证书。申请船舶建造检验和入级由乙方办理,费用包括在合同价格内,由乙方支付。
第三条 材料和设备
3.1 本船所需的材料和设备(包括进口的),除按本船说明书或另有协议应由甲方供应外,均按照本合同第一条第三款双方认定的厂商表,由乙方负责订购。甲方有权参加双方商定的船舶主要设备的验收及厂商表中规定的主要设备、材料的技术谈判。
3.2 按照规定,由乙方供应的从国外进口的设备、材料和税金等,均已列入本合同价内,由乙方支付。进口设备开箱时,乙方应通知甲方驻厂代表参加。
3.3 乙方对甲方提供的设备、仪器和材料,应及时检验,发现不符合合同规定时,应立即通知甲方调换或者补充。
3.4 乙方隐瞒原材料与设备的缺陷或者使用不符合合同规定的原材料与设备而影响船舶质量时,甲方有权要求更换、修理和减少船价。
3.5 乙方对甲方提供的设备、仪器和材料要按要求妥善保管,由于保管不善,致使甲方提供的设备、仪器和材料损坏的,乙方负责赔偿。
3.6 乙方由于原材料、设备、备品、供应品订货困难等原因影响建造进度时,征得甲方或甲方驻厂首席代表同意后,可采用符合船检要求的代用品。凡涉及船舶性能及验船规范的,还应征得船检部门的同意。
3.7 机电设备及辅助机械系统的备品、备件、工具,文件及说明书乙方应按规范要求和制造厂的标准随机备件清单(或按双方议定的清单)在交船时交给甲方。如有欠交部分,应征得甲方同意,在双方议定的日期补交或作减帐处理。上述清单应编入完工资料中。
第四条 合同价格及付款方法
4.1 合同价格
4.1.1 本船合同价格以人民币为货币单位计价、结算及支付。
4.1.2 本船每艘船舶的合同价格为人民币_________元整(¥_________)。
4.1.3 上述合同价格包括甲方委托乙方办理的进口设备和材料的费用,暂按_________万美元计,汇率暂按_________元人民币/美元,折算人民币_________(大写与小写)元整,进口部分价格按对外商务合同和实际支付日汇率进行调整。
4.1.4 上述合同价格包括施工设计、船检审图等费用,包括由甲方支配的监造费和接船费及该船的技术评估费______________元整(¥_________)。
4.1.5 上述合同价格包括进口设备的关税、增值税、手续费、监管费等,总计为进口设备的_________%。
4.1.6 本合同执行过程中,因甲方提出正式书面意见发生的项目变更或修改而引起的加减帐在交船时,同本条款4.2款规定的最后一期付款一起结算。
4.1.7 上述价格为无条件的最终封闭价。
4.2 国内部分付款方法。
4.2.1 乙方应在船舶建造前将该船的建造计划书面通知甲方,除第一期款外,其余各期付款要在一个月前书面通知当期的进度付款要求,以使甲方及时准备款额。
4.2.2 第一期付款
(1)合同经甲方上级主管机关批准后,甲方即向乙方支付合同价格的百分之二十(20%)中的50%的款额,即人民币_________元整(¥_________)。以电汇发出的日期为准(以下类同)。
(2)合同生效后30个工作日内,甲方即向乙方支付合同价格的百分之二十(20%)中的50%的款额,即人民币_______________元整(¥_________)。
4.2.3 第二期付款
甲方在收到经甲方驻厂首席代表签认的本船开工报告及付款通知单后7个工作日内(以邮局邮戳日期为准,以下类同),向乙方支付合同价格的百分之二十(20%)的款额,即人民币_________元整(¥_________)。最迟不超过十五(15)个工作日(以下类同)
4.2.4 第三期付款
甲方在收到经甲方驻厂首席代表签认的本船大合拢报告及付款通知单后7个工作日内,向乙方支付合同价格的百分之二十五(25%)的款额,即人民币_________________元整(¥_________)。
4.2.5 第四期付款
甲方在收到经甲方驻厂首席代表签认的本船下水报告及付款通知单后7个工作日内,向乙方支付合同价格的百分之二十五(25%)的款额,即人民币_________________元整(¥_________)。
4.2.6 第五期付款
在甲、乙双方签订《交接船议定书》后十五(15)个工作日内,甲方即向乙方支付合同价格的百分之十(10%)的款额,即人民币_________元整(¥),按本合同有关条款的规定经双方认可的加减帐、赔偿金、罚金等项目一起结算。
乙方同意甲方扣留船价的_________元人民币做为质量保证金,如质量保证期内未发生质量问题,则保证期满后退还乙方。
4.3 进口部分付款要求
4.3.1 进口设备的对外商务合同生效后15个工作日内,甲方即向乙方支付该商务合同价格的_________%款额。
4.3.2 根据乙方书面通知,在开具进口设备信用证前至少45天内,甲方即向乙方支付本合同价格的_________%款额。
4.3.3 以上是常规付款约定,如进口设备商务合同的付款要求有变化,则甲乙双方可另签补充协议,并以补充协议为准。
4.4 逾期补偿
如甲方未按本条款规定的日期付款,则甲方除付清价款以外,还应支付合同规定付款日期的次日算起一直到向乙方实际付款日止应付金额的利息,利息以同期建设银行规定的流动资金贷款发生利率计算。乙方不能因此影响船舶的正常工期。
第五条 合同价格的调整
5.1 交船期
5.1.1 本船交船日期不超过本合同第九条第9.1.1款规定的交船日期(有与本合同不可分割的补充协议“允许的延误”除外,下同)的当天午夜12时,本船的合同价格不作调整(如有加减帐除外)。
5.1.2 本船从超过本合同第九条第9.1.1款规定的交船日期,即______年_____月_____日午夜12时起,每天从本船合同价中扣除_________%,计人民币_________元整(¥_________),并以120天为限。如在合同规定的交船期后的120天尚不能交船,甲方有权拒收该船或另行商定交船日期及船价的减价。如甲方拒绝接船,则乙方除退还甲方全部已付本金(含由甲方提供的材料和设备的价款)和同期建设银行规定的流动资金贷款利率的利息外,还应赔偿由此给甲方造成的经济损失。
5.1.3 如果甲方要求提前交船并与乙方达成协议,则甲方应付给乙方赶工费,从本合同第九条第9.1.1款规定的本船交船日期前当天午夜12时开始,每提前一天,在本船合同价的基础上增加赶工费人民币_________元整(¥_________)。
5.1.4 本船在建造中,如甲方提出要求乙方延期交船,超过本合同第九条第9.1.1款规定的本船交船日期后十五(15)天时,必须征得乙方同意,并双方签订修改交船日期、赔偿金等协议,该协议为本合同不可分割的组成部分。
5.2 航速
如有因建造厂施工方面的原因而引起的实际试航航速未达到设计要求,如航速低于设计航速零点三至零点五(0.3~0.5)节(不含0.3节),则应扣除本船合同价的千分之五(5‰);如航速低于设计航速零点五一至零点七(0.51~0.7)节,则应扣除本船合同价的百分之一(1%);如航速低于设计航速零点八(0.8)节以上,甲方有权拒接船舶或降价接船,如甲方拒绝接船,则乙方除退还甲方全部已付本金(含由甲方提供的材料和设备的价款)和同期建设银行规定的流动资金贷款利率的利息外,还应赔偿由此给甲方造成的经济损失。
5.3 其它应要求的技术保证指标和违约责任(如拖轮系柱拖力、工程作业船的起吊重量、挖泥船的挖深、排距指标等)。
第六条 监造
6.1 图纸审查和认可
6.1.1 施工设计图纸审查按双方议定的审查目录,由乙方一式二套,分期分批送甲方审查认可。甲方在收到图纸后20天内,以书面形式提出审查意见,并将一套标注审查意见的图纸退回乙方。如甲方到时未提出意见,则表示甲方已对原图认可。乙方对甲方的书面意见应在7天内予以书面答复。如乙方未按时答复,则认为乙方已接受甲方所提的意见。如果图纸和信函邮寄,则收退图纸和信函日期以邮戳日期为准。
6.1.2 乙方应分别给甲方和甲方驻厂代表提供二套施工图纸,同时,把建造过程中由乙方发出的“修改通知单”送甲方驻厂代表一份。
6.2 甲方代表
6.2.1 甲方代表在船舶进度达到(接船厂书面通知)时进厂监造,甲方要任命首席代表。
6.2.2 为甲方代表工作方便,乙方应免费提供甲方驻厂代表的通讯、办公室、办公用品和劳动保护用品。给予住宿、伙食及交通的方便(其费用由甲方自理)。
6.2.3 为使甲方代表检验方便,乙方应为甲方及时提供施工建造进度报告。
6.3 甲方代表的权力
6.3.1 乙方应允许甲方代表进入本厂与本船建造有关的各工作场所。
6.3.2 如果甲方代表需到各设备协作厂进行检查验收,乙方应疏通渠道,但交通等费用由甲方自理。
6.3.3 本船在整个建造期间规定的一般验收和试验项目,由乙方提前一个工作日书面通知甲方代表参加试验和检查项目的时间和地点,甲方代表应及时书面确认。乙方不通知甲方代表参加而进行的检验是无效的。如甲方代表接到通知后,未按时参加试验、验收及检查,又未事前提出异议,则认为甲方代表自动弃权,乙方在船厂检验部门和船级社验船师参加下的试验、检验结果对双方有效。
6.3.4 在检查与试验验收中,如果甲方代表发现本船建造中使用的材料、设备与设计不符或施工质量问题,则应将上述情况及时书面通知乙方,乙方接到通知后应迅速处理。如乙方不同意甲方的书面意见,可书面通知甲方代表,阐明理由。在双方意见不一致的情况下,则应相互协商解决。如还有分歧,则应按本合同第十二条的规定来解决。如经裁决,乙方并无不当,甲方应承担此争议引起工程延期的责任和赔偿乙方停工的损失。但甲乙双方均不得擅自停止与该分歧无关的建造项目,或拒绝验收与该分歧无关的项目。
6.3.5 甲方代表在厂方或工地执行公务时,应遵守工厂的规章制度。如非因厂方或其工作人员在工作上的过错而造成的人身伤害时,乙方不承担责任。反之,乙方应承担医疗及善后责任。
第七条 工程变更及修改
7.1 本合同生效后,甲乙双方都要严格遵照执行。如甲乙双方任何一方提出解除、停止执行合同,因此而给对方造成的经济损失,由提出方负责赔偿。
7.2 在本船建造合同履行期内,任何一方提出修改变更合同内容,需经对方的认可并签订修改变更的补充协议,该协议为本合同不可分割的组成部分。修改变更引起合同交船期的变动、价格的调整及其他问题均以双方签订的补充协议为准。
7.3 本合同签订后,由于船舶规范、规则修改并要求本船遵守时,由此修改而引起费用增加,应调整本船合同价格。如引起交船期延长,应视为允许的延长。价格的调整和交船期的延长均以双方签订的补充协议为准。
7.4 若甲乙双方就本合同的变更或修改达不成协议,按本合同第十二条规定办理。
第八条 试航、(工程作业)与验收
8.1 通知
乙方在十五(15)天前以电报或书面传真方式通知甲方关于本船的下水时间、试航(工程作业)时间。在七(7)天前以电报或书面传真方式将确定的时间通知甲方。甲方在收到乙方这一通知后,应在三(3)天内书面传真或电报回复乙方已接到该通知,并按时派人员参加本船的试航(工程作业)。如甲方未能提出异议又不能按时派人参加试航(工程作业),则认为甲方已放弃参加本船试航(工程作业)权利,乙方可在中国船级社验船师参加下进行试航(工程作业)。经验船师签认的试航、试挖记录报告,应视作甲方已认可。
8.2 实施办法
8.2.1 系泊试验前60天,乙方提出“试车试航(工程作业)大纲”送甲方及船检部门认可。
8.2.2 乙方应在消除系泊试验时发现的缺陷后进行正式试航(工程作业),试航(工程作业)时发现的缺陷应在交船前消除。
8.2.3 本船试航(工程作业)由乙方负责。试航(工程作业)内容按双方认可的“试车试航(工程作业)大纲”进行。甲方应根据安全航行的要求提供必要的人员。试航(工程作业)期间因气候突变不能继续进行时,双方可协商暂时中止试航(工程作业),未完成的项目推迟到其后的第一个气候良好的日子继续进行。试航(工程作业)因气候不良而推迟,应视为不可抗力事件,这种延误应视为允许的延误。
8.2.4 本船试航(工程作业)所需的燃油、滑油、滑油脂的供应及费用均由乙方负责。试航(工程作业)后所剩余的各种油料,甲方按双方签字认可的数量,以结算日油料市场价格结算,作加减帐处理。
8.3 验收
8.3.1 本船试航(工程作业)结束时,乙方与甲方参加试航(工程作业)的代表应就本船试航(工程作业)结果进行协商并签署相应的试航(工程作业)文件。
8.3.2 如试航(工程作业)结果有不符合全船说明书及试验大纲的要求时,乙方应会同甲方代表调查其原因,并采取有效措施加以补救,必要时组织再试航(工程作业)。
8.3.3 甲方和乙方对本船试航(工程作业)或再试航(工程作业)的结果发生争议时,应尽快协商解决。如通过协商仍达不成一致意见时,应按照本合同第十二条的规定办理。
第九条 交船
9.1 交船日期和地点
9.1.1 本合同交船日期为:______年_____月_____日,优惠期______天(或:本合同交船期为合同生效后______月)。
9.1.2 交船地点:中华人民共和国_________市码头。
9.2 交接船
9.2.1 具体交船日期应由乙方提前十五天(15)天书面通知甲方,提前五(5)天向甲方确报。
9.2.2 当本船试车、试航(工程作业)发现的缺陷已经消除,收尾工程项目全部完成,所有设备均能正常运转,所有的备品、备件、工具及规定的证件、图纸、技术文件均已点交完毕,本船的技术性能符合本合同和全船说明书的要求。乙方即可通知甲方及甲方代表接船。甲方在接到通知后,并确信本船经验船师检验合格,应按时接船。接船时,由甲乙双方委派的代表签署《交接船议定书》。《交接船议定书》签字之日为正式交接船日期。
9.3 交接船证件
交船时,乙方应提交下列证件及有关文件。
9.3.1 《交接船议定书》及倾斜试验报告一式陆(6)份,甲、乙双方各执三(3)份。
9.3.2 按2.2.2款规定的中国船检局(ZC)颁发的证书(正副本各一份)。
9.3.3 乙方质量检查部门的《质量证书》一式肆(4)份。码头试验、航行试验(工程作业)报告一式二(2)份。
9.3.4 外购设备的随机技术文件、合格证及说明书一式叁(3)份。
9.3.5 备件清单、属具清单一式叁(3)份。
9.3.6 造船厂《建造证书》。
9.3.7 《商业发票》。
9.3.8 完工图纸叁套,按双方商定的时间提交。
9.3.9 乙方按本合同第二条第2.2.2款规定的证书提交甲方。如果证书在交船时未能得到,乙方负责提供认可和签字的临时证书,以供甲方使用,并在交船后短期内补交。
9.4 所有权和风险转移
在建造期内本船所有权归乙方所有,其风险由乙方承担。《交接船议定书》一经甲乙双方签署,本船所有权转移归甲方,其风险同时转移归甲方。
9.5 本船的移离
甲方应在本船交接签字后十五(15)日内,将本船移离交船码头,如逾期不移离,甲方应向乙方支付本船的停泊费。
第十条 不可抗力事件
10.1 在合同规定的履行期(即交船期)内,因受到地震、海啸、台风、飓风、暴风、水灾、瘟疫等自然灾害等人力不可抗拒的客观因素影响或由于材料设备供应厂发生类似上述人力不可抗拒的原因造成船舶进度延期应视为允许的延迟。
10.2 乙方应在不可抗力事件发生后二十(20)天内书面通知甲方,并附有当地法定部门证明。不可抗力事件停止时,乙方应以同样方式通知甲方。
第十一条 质量保证
11.1 缺陷的责任及范围
自双方代表签署本船《交接船议定书》之日起十二个月内为本船保修期,在此期间凡属乙方施工、工艺、以及材料、设备质量而引起的缺陷、故障和损坏,由乙方负责免费修理或更换。
凡属甲方保养使用不当造成的损坏、故障和缺陷以及易损零件的正常磨损,由乙方负责修复,甲方承担费用。
11.2 缺陷的通知
甲方在保修期内发现属于保修范围内的任何缺陷应迅速以传真或书面形式通知乙方,并说明损坏和缺陷的性质及程度。甲方发给乙方的关于在保修期内发生的损坏和缺陷的通知,乙方在本船保修期满后七(7)天内收到应是有效的(如果是以信函的方式发出则以邮戳为准)。
11.3 缺陷的处理
11.3.1 本船的保修原则上应由乙方安排进厂修理。
11.3.2 如船舶在乙方所在地之外的港口或在航行中发生属于保修范围的质量问题,船舶不能等待返回乙方解决时,甲方应及时通知乙方,乙方应及时派人前往确认处理。如乙方不能派人,应在收到甲方电报后五(5)天内电告甲方,甲方可在就近船厂或维修站进行修理或更换机件。如修理或更换项目确属乙方保修范围,由甲方提供有关验船机构的检验证明和修理厂发票,其费用由乙方承担。更换下的零部件,所有权属于乙方,由甲方随船带给乙方。
11.3.3 本船在保修期届满前,甲方提出保修时,应由乙方按照本条款第11.1款的规定安排本船的保修。若甲方提出水线下的保修工程,需要进坞检查确定,则船进坞后如经经核实,水线以下确有由于乙方建造质量引起的缺陷的损坏,则进坞费和缺陷修理费用由乙方承担,如水线以下无上述缺陷则进坞费用由甲方承担。
第十二条 合同纠纷的解决
12.1 甲、乙双方在执行本合同时所发生的一切争执和争议,都应及时协商解决,若协商不成,双方可以达成书面仲裁协议,向仲裁机构申请仲裁;双方中的任何一方可直接向人民法院提起诉讼。
12.2 如对本船的建造、机械设备或有关本船的材料或工艺质量引起争议或意见分歧,应该通知双方协商解决。当协商解决不了时,可提请法定质量监督检验机构检验并提供检验证明,在这种情况下,法定质量监督检验机构的检验是终决的,对双方均有约束力。
第十三条 合同签署与生效
13.1 本合同的甲、乙双方法定代表人或法定代表人正式书面委托的代理人在本合同正本上签字并加盖单位印章及在甲方得到其上级主管部门(中华人民共和国交通部)批准并在乙方收到甲方第一期应付款额的百分之五十(50%)后立即生效。
13.2 合同签订后,不因法定代表人或法定代表人正式书面委托的代理人的变动而变更或解除;甲、乙双方任何一方发生合并、分立时,由变更后的当事人承担或分别承担履行合同的义务和享受应有的权利。
13.3 本合同正本一式两份,双方各执一份。本合同副本十(10)份,双方各执五(5)份。副本及合同附件具有同等效力。
甲方(盖章):_____________ 乙方(盖章):_____________
法定代表人(签字):_______ 法定代表人(签字):_______
开户银行:_________________ 开户银行:_________________
银行帐号:_________________ 银行帐号:_________________